Maymarian Builders And Developers Company
Skip to content
Maymarian Builders And Developers Company
5 marla house, Bungalow in Buffer Zone, Karachi

Buffer Zone · Karachi

Bungalow for a 5 marla house in Buffer Zone.

Two fronts, no court.

What a 5 marla house means in Buffer Zone

Five marla in Buffer Zone is a compact family house. We measure the plot before we accept the word. A marla count in a message is not a dimension.

What usually goes wrong

People expect a villa and then discover the veranda, the car, and the kitchen light cannot all be large. One of them has to be chosen.

Labor rate

The labor rate waits until the plot is measured. We will not build to a marla that was guessed. On a labor rate we build the bungalow and you arrange the material. The veranda and the stair are still drawn first. A labor gang cannot invent them on site without costing you the room they occupy.

With material

Material is ordered to the measured footprint. A guess here becomes the wrong steel. With material, we supply what the bungalow scope lists and we build it. Shade, the roof, and the wet areas are in that list. A glass front is not a substitute for a veranda that works in June.

What moves the figure

A bungalow rate in Buffer Zone moves with the covered area, whether the car actually fits the lane, and whether the contract is labor only or with material.

Have this ready when you call

  1. 01

    The plot dimensions, measured, including any cut the road has taken.

  2. 02

    Who lives in the house, so the rooms are not a foyer with beds around it.

  3. 03

    Whether the car must enter, and from which side.

  4. 04

    Labor rate or with material.

Labor rate or with material

Call for the Buffer Zone rate.

Maymarian builds Karachi residential houses on 80, 120, 240, 400, 600, 800, and 1,000 square yard plots. You can take a labor rate, or a contract with material. The figure is given on the phone, for this plot.

Labor rate

We build. You arrange the material. The labor rate follows the covered area on the Buffer Zone plot.

With material

Labor and material in one contract. Cement, steel, and the rest sit in the scope we read with you.

What you are walking into

  1. 01

    Wet areas are scattered, so the plumbing crosses the whole plan.

  2. 02

    Bedrooms open onto the drawing room. There is no quiet end of the house.

  3. 03

    The kitchen is a corridor behind the show rooms.

What changes after the visit

  1. 01

    A modest bungalow is allowed to be modest. Fewer rooms that can hold a bed.

  2. 02

    The servant yard stays if you need it.

  3. 03

    One court, not two performances.

After keys

  • Weekly reports, staged payments, no disappearing act. That is why we used them again.

    Tariq Farhan, Palm Court, Seaview

  • A small office, but the same people who sat in the first meeting walked the slab with us.

    Ahmed Raza, Bungalow Eleven, Gulshan-e-Maymar

  • They stayed on site until the snag list was closed. Handover matched the drawings we signed.

    Imran Habib, Azure House, Clifton

The office

Coastal hardware and a Maymar lane are specified differently, by the office that has stood on both.

Tariq Mansoor Bangash, Owner

5 marla house in Buffer Zone

A 5 marla house is the family bungalow people describe when they are not thinking in square yards. In Buffer Zone we still measure the plot. A marla count on a message is not a dimension we will build to.

Five marla is tight enough that the veranda, the car, and the kitchen light have to be chosen on purpose. Bungalow for this house is a modest plan, not a villa with the second floor deleted.

Bungalow in Buffer Zone follows this ground. Plots in Buffer Zone punish a plan copied from a 240 yard Maymar house. The rooms become corridors. We would rather draw fewer rooms that can hold a bed.

On this ground

A Buffer Zone price asked for on the phone is a guess. The visit is what turns it into a scope.

We do not publish which sector of Buffer Zone is best. Two plots on one road can differ by a metre of fill.

Buffer Zone lanes are narrow. Shuttering and a mixer have to be sequenced so the neighbour’s gate still opens.

Plots in Buffer Zone punish a plan copied from a 240 yard Maymar house. The rooms become corridors. We would rather draw fewer rooms that can hold a bed.

Do you build 5 marla houses in Buffer Zone?

Yes. Call 0321-2000130 or 0321-2000690 after the plot is measured. We give the labor rate or the rate with material for that house.

Can the bungalow be double storey?

Yes, if the slab is designed for it from the start.

Is a bungalow the same as house construction?

A bungalow is a single-family house. House construction is the wider contract. If you want this shape of house, say so and we scope that.

Can the veranda face the side?

Yes, when that is where the breeze is. A front veranda that faces a hot wall is not a principle we will defend.

Call for the rate

Ask for a written scope after the visit. That page is what the contract is built from. Labor rate or with material. The figure is on the phone.