What a double storey house means in Landhi
A double storey in Landhi is decided in the first slab: the stair, the toilet drops, and the weight of the upper floor. If the house is already standing, the first job is to look at that slab.
What usually goes wrong
Promising the first floor later, on concrete nobody designed for it.
Labor rate
Labor for two floors includes the stair. A hole with no stair is not a complete structure. On a labor rate we build the bungalow and you arrange the material. The veranda and the stair are still drawn first. A labor gang cannot invent them on site without costing you the room they occupy.
With material
With material, the upper floor is in the steel of the first slab, or it is refused. It is not implied. With material, we supply what the bungalow scope lists and we build it. Shade, the roof, and the wet areas are in that list. A glass front is not a substitute for a veranda that works in June.
What moves the figure
A bungalow rate in Landhi moves with the covered area, whether the car actually fits the lane, and whether the contract is labor only or with material.
Have this ready when you call
- 01
The plot dimensions, measured, including any cut the road has taken.
- 02
Who lives in the house, so the rooms are not a foyer with beds around it.
- 03
Whether the car must enter, and from which side.
- 04
Labor rate or with material.
Labor rate or with material
Call for the Landhi rate.
Maymarian builds Karachi residential houses on 80, 120, 240, 400, 600, 800, and 1,000 square yard plots. You can take a labor rate, or a contract with material. The figure is given on the phone, for this plot.
Labor rate
We build. You arrange the material. The labor rate follows the covered area on the Landhi plot.
With material
Labor and material in one contract. Cement, steel, and the rest sit in the scope we read with you.
What you are walking into
- 01
June needs a generator because the house faces the heat.
- 02
The veranda is a strip of leftover tile, not a room.
- 03
A tight plot is being asked to hold a villa’s manners.
What changes after the visit
- 01
A modest bungalow is allowed to stay modest.
- 02
A modest bungalow is allowed to be modest. Fewer rooms that can hold a bed.
- 03
The car is checked against the real turning, not the symbol on the plan.
After keys
They stayed on site until the snag list was closed. Handover matched the drawings we signed.
Imran Habib, Azure House, Clifton
Weekly reports, staged payments, no disappearing act. That is why we used them again.
Tariq Farhan, Palm Court, Seaview
A small office, but the same people who sat in the first meeting walked the slab with us.
Ahmed Raza, Bungalow Eleven, Gulshan-e-Maymar
The office
Coastal hardware and a Maymar lane are specified differently, by the office that has stood on both.
Tariq Mansoor Bangash, Owner
double storey house in Landhi
A double storey house in Landhi is decided in the first slab. The stair, the toilet drops, and the weight of the upper floor have to be in the concrete. Promising the first floor later, on a slab nobody designed for it, is how the argument starts.
If the house is already standing and you want a floor added, that is a look at the existing structure, not a paint job. Bungalow either includes the upper floor now or it says the slab cannot take it.
Bungalow in Landhi follows this ground. A Landhi house should be cool at the veranda before it tries to look like a glass box. Shade, the roof, and the wet areas matter more than a street facade copied from the coast.
On this ground
A house in Landhi should still be legible in ten years.
Landhi is a lane, a fill, and a sewer position. Those three matter more than the sector’s reputation.
Landhi is supervised from Maymar on a fixed visit rhythm. The same person who scoped the house comes back for the slab.
A Landhi house should be cool at the veranda before it tries to look like a glass box. Shade, the roof, and the wet areas matter more than a street facade copied from the coast.
Do you build a double storey in Landhi?
Yes, when the structure is drawn for two floors. Call 0321-2000130 or 0321-2000690 for the labor rate or the rate with material. An extra floor on an old slab waits until we have seen that slab.
Do you build bungalows in Landhi?
Yes. A single-family house with a veranda, planned for the plot and the lane, not copied from a villa.
Do you take bungalow renovation as well as a new bungalow?
Renovation is its own contract. A new bungalow is this one. We do not mix the prices.
Do you give a bungalow rate for Landhi?
After the visit. Not on the phone.
Call for the rate
Ask for the written scope. That page becomes the contract. Labor rate or with material. The figure is on the phone.