What a 200 square yard plot means in Federal B Area
Two hundred yards in Federal B Area can take the rooms a family names, plus one decision: the extra room, or the light. Both at once is how the plan gets worse.
What usually goes wrong
People invent a fourth room to use the yardage. The house then has no wall that can hold a bed and a window.
Labor rate
Labor follows the rooms you keep, not the rooms a relative added in the margin. A labor rate on grey structure is the mason, the carpenter, the steel fixer, and the helpers. You supply cement, steel, brick, sand, and crush. The stair opening and the toilet drops still have to be in the drawing, or the labor builds a frame the finish cannot use.
With material
Material follows the same rooms. An extra bathroom that was never drawn becomes an extra slab and an extra stack of steel. With material, those same items are in our contract. Steel weight and slab thickness are why two grey-structure quotes on the same Federal B Area plot do not match. We name them before anyone orders.
What moves the figure
The grey-structure figure in Federal B Area moves with the hole we dig, the span of the lanter, whether another floor sits on it, and how much brickwork is inside the stop line.
Have this ready when you call
- 01
Plot papers and the yardage on the ground, not only in the chat.
- 02
Whether a floor will be added later. That decision is made in this slab.
- 03
Where the bathrooms are. The drops cannot be invented after the concrete.
- 04
Labor rate, or with material.
Labor rate or with material
Call for the Federal B Area rate.
Maymarian builds Karachi residential houses on 80, 120, 240, 400, 600, 800, and 1,000 square yard plots. You can take a labor rate, or a contract with material. The figure is given on the phone, for this plot.
Labor rate
We build. You arrange the material. The labor rate follows the covered area on the Federal B Area plot.
With material
Labor and material in one contract. Cement, steel, and the rest sit in the scope we read with you.
What you are walking into
- 01
Old foundations from a demolished house are still in the hole, and the programme ignores them.
- 02
The stair opening is a hole. The stair itself was left for someone else to invent.
- 03
The stair opening moved after the steel was cut.
What changes after the visit
- 01
Each stage is photographed, including the cover.
- 02
The frame stays regular. Complex concrete is a choice you can see in the price.
- 03
The stop line between structure and finish is a sentence in the scope.
After keys
They stayed on site until the snag list was closed. Handover matched the drawings we signed.
Imran Habib, Azure House, Clifton
Weekly reports, staged payments, no disappearing act. That is why we used them again.
Tariq Farhan, Palm Court, Seaview
A small office, but the same people who sat in the first meeting walked the slab with us.
Ahmed Raza, Bungalow Eleven, Gulshan-e-Maymar
The office
Maymarian Builders And Developers Company is owned by Tariq Mansoor Bangash. The office is First R1 Lane, A42, Gulshan-e-Maymar, Karachi.
Tariq Mansoor Bangash, Owner
200 square yard house in Federal B Area
A 200 square yard plot in Federal B Area is the awkward middle. It invites one extra room that ruins the others. We would rather draw the rooms the family named than invent a fourth to use up the yardage.
A 200 square yard house in Federal B Area is priced two ways: labor rate, or with material. Fill and covered area move both. Call 0321-2000130 or 0321-2000690 for the rate on this plot.
Grey structure in Federal B Area follows this ground. A Federal B Area house sits against neighbours who are already there. Drainage, the party wall, and a bathroom that has to stay usable during renovation decide the first week.
On this ground
A house in Federal B Area should still be legible in ten years.
Federal B Area is supervised from Gulshan-e-Maymar, not from a site hut with no name.
Federal B Area streets are lived in. Deliveries and working hours are part of the method, not a footnote.
A Federal B Area house sits against neighbours who are already there. Drainage, the party wall, and a bathroom that has to stay usable during renovation decide the first week.
Is a 200 square yard house the same plan as a 240?
No. Two hundred yards in Federal B Area gets its own section. Scaling a larger plan is how a room becomes a passage.
What if the Federal B Area plot is filled?
The footing follows the soil we find. We will not pour a borrowed detail on loose fill to keep a date.
Are photographs part of grey structure?
Yes. Cover and curing are in the note.
How do we start grey structure in Federal B Area?
WhatsApp 0321-2000130 with the plot and a photograph of the lane. We visit before we order steel.
Call for the rate
WhatsApp the plot number. We will say whether this is a job we should walk. Labor rate or with material. The figure is on the phone.


