Maymarian Builders And Developers Company
Skip to content
Maymarian Builders And Developers Company
80 square yard plot, Grey structure in Federal B Area, Karachi

Federal B Area · Karachi

Grey structure for an 80 square yard plot in Federal B Area.

Curing was promised in a voice note.

What an 80 square yard plot means in Federal B Area

On 80 square yards in Federal B Area you can have a real room, a stair if the house is two floors, and a kitchen that is not the corridor. A car fits only if the lane allows the cut. A foyer does not fit.

What usually goes wrong

The usual mistake is pasting a 240 yard plan onto 80 yards until every bedroom is a passage. Grey structure here gets its own section.

Labor rate

Labor on 80 yards is a short job, so a wrong stair shows up immediately. A labor rate on grey structure is the mason, the carpenter, the steel fixer, and the helpers. You supply cement, steel, brick, sand, and crush. The stair opening and the toilet drops still have to be in the drawing, or the labor builds a frame the finish cannot use.

With material

The material list is smaller than a 240, and it is still specific: the steel in that stair and the brick in those rooms, not a rate copied from a bigger house. With material, those same items are in our contract. Steel weight and slab thickness are why two grey-structure quotes on the same Federal B Area plot do not match. We name them before anyone orders.

What moves the figure

The grey-structure figure in Federal B Area moves with the hole we dig, the span of the lanter, whether another floor sits on it, and how much brickwork is inside the stop line.

Have this ready when you call

  1. 01

    Plot papers and the yardage on the ground, not only in the chat.

  2. 02

    Whether a floor will be added later. That decision is made in this slab.

  3. 03

    Where the bathrooms are. The drops cannot be invented after the concrete.

  4. 04

    Labor rate, or with material.

Labor rate or with material

Call for the Federal B Area rate.

Maymarian builds Karachi residential houses on 80, 120, 240, 400, 600, 800, and 1,000 square yard plots. You can take a labor rate, or a contract with material. The figure is given on the phone, for this plot.

Labor rate

We build. You arrange the material. The labor rate follows the covered area on the Federal B Area plot.

With material

Labor and material in one contract. Cement, steel, and the rest sit in the scope we read with you.

What you are walking into

  1. 01

    Old foundations from a demolished house are still in the hole, and the programme ignores them.

  2. 02

    The stair opening is a hole. The stair itself was left for someone else to invent.

  3. 03

    The stair opening moved after the steel was cut.

What changes after the visit

  1. 01

    Each stage is photographed, including the cover.

  2. 02

    The frame stays regular. Complex concrete is a choice you can see in the price.

  3. 03

    The stop line between structure and finish is a sentence in the scope.

After keys

  • They stayed on site until the snag list was closed. Handover matched the drawings we signed.

    Imran Habib, Azure House, Clifton

  • Weekly reports, staged payments, no disappearing act. That is why we used them again.

    Tariq Farhan, Palm Court, Seaview

  • A small office, but the same people who sat in the first meeting walked the slab with us.

    Ahmed Raza, Bungalow Eleven, Gulshan-e-Maymar

The office

Maymarian Builders And Developers Company is owned by Tariq Mansoor Bangash. The office is First R1 Lane, A42, Gulshan-e-Maymar, Karachi.

Tariq Mansoor Bangash, Owner

80 square yard house in Federal B Area

An 80 square yard house in Federal B Area cannot wear a 240 yard plan. The stair, the car, and one real room have to be drawn for this footprint, or the house becomes a corridor with a bed in it.

An 80 square yard house in Federal B Area can be a labor rate, or a contract with material. Covered area and the lane move the figure. Call 0321-2000130 or 0321-2000690 and we will give you that rate. It is not printed on this page.

Grey structure in Federal B Area follows this ground. A Federal B Area house sits against neighbours who are already there. Drainage, the party wall, and a bathroom that has to stay usable during renovation decide the first week.

On this ground

A house in Federal B Area should still be legible in ten years.

Federal B Area is supervised from Gulshan-e-Maymar, not from a site hut with no name.

Federal B Area streets are lived in. Deliveries and working hours are part of the method, not a footnote.

A Federal B Area house sits against neighbours who are already there. Drainage, the party wall, and a bathroom that has to stay usable during renovation decide the first week.

Can you build on an 80 square yard plot in Federal B Area?

Yes. Call 0321-2000130 or 0321-2000690 for the labor rate or the rate with material. WhatsApp is on 0321-2000130. The plan is drawn for 80 yards, not shrunk from a larger house.

What if the Federal B Area plot is filled?

The footing follows the soil we find. We will not pour a borrowed detail on loose fill to keep a date.

Are photographs part of grey structure?

Yes. Cover and curing are in the note.

How do we start grey structure in Federal B Area?

WhatsApp 0321-2000130 with the plot and a photograph of the lane. We visit before we order steel.

Call for the rate

WhatsApp the plot number. We will say whether this is a job we should walk. Labor rate or with material. The figure is on the phone.