120 square yard plot, Grey structure in Korangi, Karachi

Korangi · Karachi

Grey structure for a 120 square yard plot in Korangi.

Fill was called normal. Your foot says otherwise.

What a 120 square yard plot means in Korangi

A 120 square yard house in Korangi is the family size we see most. One stair, wet areas stacked above each other, and a car only when the turning on this lane is real.

What usually goes wrong

Quotes for 120 yards disagree because they hide different covered areas. Compare the drawing, not the yardage on the letter.

Labor rate

A labor rate on 120 yards still needs you to know the covered area. Two families on the same plot can build very different houses. A labor rate on grey structure is the mason, the carpenter, the steel fixer, and the helpers. You supply cement, steel, brick, sand, and crush. The stair opening and the toilet drops still have to be in the drawing, or the labor builds a frame the finish cannot use.

With material

With material, the cement and steel follow that covered area. A 120 is not half of a 240, so the slab is not half a 240 slab. With material, those same items are in our contract. Steel weight and slab thickness are why two grey-structure quotes on the same Korangi plot do not match. We name them before anyone orders.

What moves the figure

The grey-structure figure in Korangi moves with the hole we dig, the span of the lanter, whether another floor sits on it, and how much brickwork is inside the stop line.

Have this ready when you call

  1. 01

    Plot papers and the yardage on the ground, not only in the chat.

  2. 02

    Whether a floor will be added later. That decision is made in this slab.

  3. 03

    Where the bathrooms are. The drops cannot be invented after the concrete.

  4. 04

    Labor rate, or with material.

Labor rate or with material

Call for the Korangi rate.

Maymarian builds Karachi residential houses on 80, 120, 240, 400, 600, 800, and 1,000 square yard plots. You can take a labor rate, or a contract with material. The figure is given on the phone, for this plot.

Labor rate

We build. You arrange the material. The labor rate follows the covered area on the Korangi plot.

With material

Labor and material in one contract. Cement, steel, and the rest sit in the scope we read with you.

What you are walking into

  1. 01

    Brickwork has no stop line, so the finish argument starts inside the structure bill.

  2. 02

    Shuttering is planned as if the neighbour’s lane belongs to you.

  3. 03

    The stair opening is a hole. The stair itself was left for someone else to invent.

What changes after the visit

  1. 01

    We refuse a cantilever the plot does not need.

  2. 02

    Each stage is photographed, because the plaster crew may not be us.

  3. 03

    The lanter is specified: thickness, steel, and whether another floor is real.

After keys

  • They stayed on site until the snag list was closed. Handover matched the drawings we signed.

    Imran Habib, Azure House, Clifton

  • Weekly reports, staged payments, no disappearing act. That is why we used them again.

    Tariq Farhan, Palm Court, Seaview

  • A small office, but the same people who sat in the first meeting walked the slab with us.

    Ahmed Raza, Bungalow Eleven, Gulshan-e-Maymar

The office

Tariq Mansoor Bangash owns the company. The drawing set and the site walk are the same people.

Tariq Mansoor Bangash, Owner

120 square yard house in Korangi

A 120 square yard house is the size that shows up most often in Korangi searches and in the folder of quotes a family brings to the office. Those quotes rarely share a covered area, which is why they do not agree.

120 square yards is not a smaller 240. The section, the stair, and the wet areas change. Grey structure on this plot starts with measuring the lane, including the cut the road has already taken.

Grey structure in Korangi follows this ground. Korangi plots vary from settled lanes to edges that are still finding their levels. We do not reuse a Maymar footing detail until we have stood on the plot.

On this ground

The Korangi house should still be legible in ten years: regular bays, a stair that was drawn, a roof someone can walk.

Tariq Mansoor Bangash owns Maymarian. Korangi work is run from First R1 Lane, A42, not from a site hut with no name on the gate.

Korangi is a planned haul from the Gulshan-e-Maymar office. The programme includes that road. It should not appear as a surprise in month four.

Korangi plots vary from settled lanes to edges that are still finding their levels. We do not reuse a Maymar footing detail until we have stood on the plot.

Do you take a 120 square yard house in Korangi?

Yes. Call 0321-2000130 or 0321-2000690. Say whether you want the labor rate or the contract with material, and we will give the rate for this 120 yard plot.

Do you take grey structure in Korangi?

Yes. Foundations, columns, slabs, and brickwork, stopped at a written line. The office is in Gulshan-e-Maymar.

Who builds the grey structure?

Maymarian Builders And Developers Company, owned by Tariq Mansoor Bangash. Site and drawing are the same office.

How do we start grey structure in Korangi?

WhatsApp 0321-2000130 with the plot and a photograph of the lane. We visit before we order steel.

Call for the rate

Send the lane and the yardage. The figure comes after the visit, not before it. Labor rate or with material. The figure is on the phone.