What an 80 square yard plot means in Scheme 33
On 80 square yards in Scheme 33 you can have a real room, a stair if the house is two floors, and a kitchen that is not the corridor. A car fits only if the lane allows the cut. A foyer does not fit.
What usually goes wrong
The usual mistake is pasting a 240 yard plan onto 80 yards until every bedroom is a passage. Grey structure here gets its own section.
Labor rate
Labor on 80 yards is a short job, so a wrong stair shows up immediately. A labor rate on grey structure is the mason, the carpenter, the steel fixer, and the helpers. You supply cement, steel, brick, sand, and crush. The stair opening and the toilet drops still have to be in the drawing, or the labor builds a frame the finish cannot use.
With material
The material list is smaller than a 240, and it is still specific: the steel in that stair and the brick in those rooms, not a rate copied from a bigger house. With material, those same items are in our contract. Steel weight and slab thickness are why two grey-structure quotes on the same Scheme 33 plot do not match. We name them before anyone orders.
What moves the figure
The grey-structure figure in Scheme 33 moves with the hole we dig, the span of the lanter, whether another floor sits on it, and how much brickwork is inside the stop line.
Have this ready when you call
- 01
Plot papers and the yardage on the ground, not only in the chat.
- 02
Whether a floor will be added later. That decision is made in this slab.
- 03
Where the bathrooms are. The drops cannot be invented after the concrete.
- 04
Labor rate, or with material.
Labor rate or with material
Call for the Scheme 33 rate.
Maymarian builds Karachi residential houses on 80, 120, 240, 400, 600, 800, and 1,000 square yard plots. You can take a labor rate, or a contract with material. The figure is given on the phone, for this plot.
Labor rate
We build. You arrange the material. The labor rate follows the covered area on the Scheme 33 plot.
With material
Labor and material in one contract. Cement, steel, and the rest sit in the scope we read with you.
What you are walking into
- 01
You want to stop and finish next year, and nothing is marked for that year.
- 02
The stair opening is a hole. The stair itself was left for someone else to invent.
- 03
Brickwork has no stop line, so the finish argument starts inside the structure bill.
What changes after the visit
- 01
Brickwork stops at a line you can point at. The finish contract starts there.
- 02
Curing is a stage, not a slogan.
- 03
We say so if the fill is loose, before the order, not after the crack.
After keys
A small office, but the same people who sat in the first meeting walked the slab with us.
Ahmed Raza, Bungalow Eleven, Gulshan-e-Maymar
They stayed on site until the snag list was closed. Handover matched the drawings we signed.
Imran Habib, Azure House, Clifton
Weekly reports, staged payments, no disappearing act. That is why we used them again.
Tariq Farhan, Palm Court, Seaview
The office
Copyright in our drawings stays with the company until a commission says otherwise.
Tariq Mansoor Bangash, Owner
80 square yard house in Scheme 33
An 80 square yard house in Scheme 33 cannot wear a 240 yard plan. The stair, the car, and one real room have to be drawn for this footprint, or the house becomes a corridor with a bed in it.
An 80 square yard house in Scheme 33 can be a labor rate, or a contract with material. Covered area and the lane move the figure. Call 0321-2000130 or 0321-2000690 and we will give you that rate. It is not printed on this page.
On a filled Scheme 33 plot the grey structure is the whole risk. Footings follow the soil we find, not a detail copied from a Maymar lane two kilometres away. If the fill is loose, we say so before the steel is ordered.
On this ground
Materials for Scheme 33 follow the road you have, including the week it is dug up.
If the Scheme 33 plot is filled, the footing follows the soil in the hole. A detail borrowed from another block is only a guess.
Travel from our Gulshan-e-Maymar office is short enough that the same site engineer can hold the job. Access inside Scheme 33 depends on the block. We visit before we programme concrete.
Some Scheme 33 land is filled. Footings follow that fact. We do not reuse a Maymar footing detail on a plot that sponges underfoot. The plinth is set to the road you have, including the monsoon level of that road.
Can you build on an 80 square yard plot in Scheme 33?
Yes. Call 0321-2000130 or 0321-2000690 for the labor rate or the rate with material. WhatsApp is on 0321-2000130. The plan is drawn for 80 yards, not shrunk from a larger house.
What does grey structure in Scheme 33 cost?
Covered area, soil, and whether the roof must take a later room all change the figure. We price it after a visit. There is no per-yard card.
Can grey structure in Scheme 33 be paused?
Yes. The pause is real only if drops, levels, and the stair are already decided.
Can the roof take another room later?
Only if we designed it to. A hope is not a load.
Call for the rate
Book the walk while the fill is still the fill you saw. Labor rate or with material. The figure is on the phone.