What a 240 square yard plot means in Shah Faisal
A 240 square yard plot in Shah Faisal can hold a family house, a car, and some open ground. It cannot hold all three if a double-height foyer is allowed to eat a bedroom.
What usually goes wrong
Treating 240 as a double of 120 produces the wrong stair and the wrong car turning. We measure the plot before we draw either.
Labor rate
The labor rate is for this footprint. It is not a 120 yard rate multiplied. A labor rate on grey structure is the mason, the carpenter, the steel fixer, and the helpers. You supply cement, steel, brick, sand, and crush. The stair opening and the toilet drops still have to be in the drawing, or the labor builds a frame the finish cannot use.
With material
With material, the roof and the stair are the lines that move. They are different problems from a 120. With material, those same items are in our contract. Steel weight and slab thickness are why two grey-structure quotes on the same Shah Faisal plot do not match. We name them before anyone orders.
What moves the figure
The grey-structure figure in Shah Faisal moves with the hole we dig, the span of the lanter, whether another floor sits on it, and how much brickwork is inside the stop line.
Have this ready when you call
- 01
Plot papers and the yardage on the ground, not only in the chat.
- 02
Whether a floor will be added later. That decision is made in this slab.
- 03
Where the bathrooms are. The drops cannot be invented after the concrete.
- 04
Labor rate, or with material.
Labor rate or with material
Call for the Shah Faisal rate.
Maymarian builds Karachi residential houses on 80, 120, 240, 400, 600, 800, and 1,000 square yard plots. You can take a labor rate, or a contract with material. The figure is given on the phone, for this plot.
Labor rate
We build. You arrange the material. The labor rate follows the covered area on the Shah Faisal plot.
With material
Labor and material in one contract. Cement, steel, and the rest sit in the scope we read with you.
What you are walking into
- 01
The lintel and the lanter were priced as the same word.
- 02
The stair opening moved after the steel was cut.
- 03
The stair opening is a hole. The stair itself was left for someone else to invent.
What changes after the visit
- 01
We say so if the fill is loose, before the order, not after the crack.
- 02
Footings follow the soil in this hole, not a detail from another block.
- 03
Excavation is sequenced so the lane is not occupied for a month.
After keys
Weekly reports, staged payments, no disappearing act. That is why we used them again.
Tariq Farhan, Palm Court, Seaview
They stayed on site until the snag list was closed. Handover matched the drawings we signed.
Imran Habib, Azure House, Clifton
A small office, but the same people who sat in the first meeting walked the slab with us.
Ahmed Raza, Bungalow Eleven, Gulshan-e-Maymar
The office
Maymarian™ is the trademark of Maymarian Builders And Developers Company. The scheme next door is a different name.
Tariq Mansoor Bangash, Owner
240 square yard house in Shah Faisal
A 240 square yard house in Shah Faisal has room to make a mistake look generous. A double-height foyer can eat a bedroom and still leave yardage on the drawing. We check the plot is actually 240 on the ground before we draw that covered area.
People compare a 240 yard house with a 120 as if one were a double of the other. The roof, the stair, and the car turning are different, and so is the rate. Call 0321-2000130 or 0321-2000690 for the labor rate or the rate with material in Shah Faisal.
Grey structure in Shah Faisal follows this ground. Shah Faisal houses sit near a loud corridor. The plan should put bedrooms off the noise and keep a veranda that is actually usable. A sealed glass front is not a comfort in June.
On this ground
Search interest in Shah Faisal is usually a plot the family already owns. That is the job we take.
A house in Shah Faisal should still be legible in ten years.
Shah Faisal is reachable from the Maymar office in one trip. The lane inside the colony is the part we have to see.
Shah Faisal houses sit near a loud corridor. The plan should put bedrooms off the noise and keep a veranda that is actually usable. A sealed glass front is not a comfort in June.
Can you build a 240 square yard house in Shah Faisal?
Yes, when the papers and the lane agree that the plot is 240. Call 0321-2000130 or 0321-2000690. We price it as 240, labor rate or with material, not as a larger 120.
How do we start grey structure in Shah Faisal?
WhatsApp 0321-2000130 with the plot and a photograph of the lane. We visit before we order steel.
Do you include the stair in grey structure?
The stair is drawn and the opening is built. A hole with no stair is not a complete structure.
Can you start grey structure before the papers are clear?
No. Excavation waits until the authority for that plot is understood. A start that stops is not progress.
Call for the rate
Bring the papers to First R1 Lane, A42. We read the dimensions with you. Labor rate or with material. The figure is on the phone.