What an 800 square yard plot means in Buffer Zone
Eight hundred square yards in Buffer Zone can be two wings, if the family needs two wings. Otherwise it is one house and open ground. The plot size is not a reason to double the roof.
What usually goes wrong
A foyer wing is the usual waste. It spends a bedroom on a space nobody sits in at 3 p.m.
Labor rate
We price labor for the rooms that are lived in. A ceremonial hall is a choice you can see in the scope. A labor rate means Maymarian builds and you arrange the material: cement, steel, brick, sand, and crush. You still need a drawing, because labor on the wrong plan is wasted money.
With material
With material, that hall is steel, slab, and brick. If you do not want it, it does not enter the contract. With material means labor and material are one contract. We buy what the scope names, and you are not running to the market between the footing and the slab.
What moves the figure
In Buffer Zone the figure moves with covered area, one floor or two, whether the contract stops at grey structure, how much fill is in the hole, and whether you chose labor only or material with it.
Have this ready when you call
- 01
The plot papers, and the yardage written on them.
- 02
The lane, so we know how concrete and steel arrive in Buffer Zone.
- 03
How many people sleep there, and whether the house is one floor or two.
- 04
Whether you want a labor rate or a contract with material.
Labor rate or with material
Call for the Buffer Zone rate.
Maymarian builds Karachi residential houses on 80, 120, 240, 400, 600, 800, and 1,000 square yard plots. You can take a labor rate, or a contract with material. The figure is given on the phone, for this plot.
Labor rate
We build. You arrange the material. The labor rate follows the covered area on the Buffer Zone plot.
With material
Labor and material in one contract. Cement, steel, and the rest sit in the scope we read with you.
What you are walking into
- 01
The family is ready to move and the papers still do not match the ground.
- 02
Grey structure was described as optional and then as already included.
- 03
A three-room plan was stretched until the rooms became corridors with beds in them.
What changes after the visit
- 01
Drainage, the lane, and the neighbour’s wall are in the first conversation.
- 02
You get a written scope after the visit. That is the page the contract comes from.
- 03
Plots from 80 to 1,000 square yards get their own section. We do not scale one plan and hope.
After keys
They stayed on site until the snag list was closed. Handover matched the drawings we signed.
Imran Habib, Azure House, Clifton
Weekly reports, staged payments, no disappearing act. That is why we used them again.
Tariq Farhan, Palm Court, Seaview
A small office, but the same people who sat in the first meeting walked the slab with us.
Ahmed Raza, Bungalow Eleven, Gulshan-e-Maymar
The office
The weekly note shows the problem before it shows the progress. That is the practice, not a slogan under the logo.
Tariq Mansoor Bangash, Owner
800 square yard house in Buffer Zone
An 800 square yard house in Buffer Zone is large enough to waste a wing on a foyer. We check who lives there before we spend the yardage. The plot size is not a reason to double the roof.
The labor rate and the with-material rate for 800 yards are different numbers, and both move with the drawing. Call 0321-2000130 or 0321-2000690. House construction here is a Karachi residential house, quoted for this plot.
House construction in Buffer Zone follows this ground. Plots in Buffer Zone punish a plan copied from a 240 yard Maymar house. The rooms become corridors. We would rather draw fewer rooms that can hold a bed.
On this ground
A Buffer Zone price asked for on the phone is a guess. The visit is what turns it into a scope.
We read the Buffer Zone papers against the ground and we show you the line where they do not match.
Buffer Zone lanes are narrow. Shuttering and a mixer have to be sequenced so the neighbour’s gate still opens.
Plots in Buffer Zone punish a plan copied from a 240 yard Maymar house. The rooms become corridors. We would rather draw fewer rooms that can hold a bed.
Can I get an 800 square yard rate in Buffer Zone?
Yes, by phone. Call 0321-2000130 or 0321-2000690 and say labor rate or with material. We do not print an 800 yard card.
Do you design and build?
Yes. Architecture and construction sit in one office. The drawing and the wall have the same author.
Can you build a 120 square yard house in Buffer Zone?
Yes. It gets its own plan. We do not shrink a larger house until the rooms stop working.
Is the society office the same as yours?
No. We build houses. Allotment of scheme plots is a different door, including in Buffer Zone.
Call for the rate
WhatsApp the plot number. We will say whether this is a job we should walk. Labor rate or with material. The figure is on the phone.


