What a 5 marla house means in Gadap
Five marla in Gadap is a compact family house. We measure the plot before we accept the word. A marla count in a message is not a dimension.
What usually goes wrong
People expect a villa and then discover the veranda, the car, and the kitchen light cannot all be large. One of them has to be chosen.
Labor rate
The labor rate waits until the plot is measured. We will not build to a marla that was guessed. A labor rate means Maymarian builds and you arrange the material: cement, steel, brick, sand, and crush. You still need a drawing, because labor on the wrong plan is wasted money.
With material
Material is ordered to the measured footprint. A guess here becomes the wrong steel. With material means labor and material are one contract. We buy what the scope names, and you are not running to the market between the footing and the slab.
What moves the figure
In Gadap the figure moves with covered area, one floor or two, whether the contract stops at grey structure, how much fill is in the hole, and whether you chose labor only or material with it.
Have this ready when you call
- 01
The plot papers, and the yardage written on them.
- 02
The lane, so we know how concrete and steel arrive in Gadap.
- 03
How many people sleep there, and whether the house is one floor or two.
- 04
Whether you want a labor rate or a contract with material.
Labor rate or with material
Call for the Gadap rate.
Maymarian builds Karachi residential houses on 80, 120, 240, 400, 600, 800, and 1,000 square yard plots. You can take a labor rate, or a contract with material. The figure is given on the phone, for this plot.
Labor rate
We build. You arrange the material. The labor rate follows the covered area on the Gadap plot.
With material
Labor and material in one contract. Cement, steel, and the rest sit in the scope we read with you.
What you are walking into
- 01
You were told every house of this yardage costs the same.
- 02
A glass front was praised, and nobody asked about June.
- 03
You are being hurried toward a start so the conversation does not have to include the plinth.
What changes after the visit
- 01
The same office draws the set and walks the slab.
- 02
Weekly notes show what changed on site, including the parts that were wrong.
- 03
Steel, slab, and brick are stages you can see before you pay the next one.
After keys
They stayed on site until the snag list was closed. Handover matched the drawings we signed.
Imran Habib, Azure House, Clifton
Weekly reports, staged payments, no disappearing act. That is why we used them again.
Tariq Farhan, Palm Court, Seaview
A small office, but the same people who sat in the first meeting walked the slab with us.
Ahmed Raza, Bungalow Eleven, Gulshan-e-Maymar
The office
Coastal hardware and a Maymar lane are specified differently, by the office that has stood on both.
Tariq Mansoor Bangash, Owner
5 marla house in Gadap
A 5 marla house is the family bungalow people describe when they are not thinking in square yards. In Gadap we still measure the plot. A marla count on a message is not a dimension we will build to.
Five marla is tight enough that the veranda, the car, and the kitchen light have to be chosen on purpose. House construction for this house is a modest plan, not a villa with the second floor deleted.
House construction in Gadap follows this ground. Gadap land is not one soil. Fill, water, and whether a road exists in the rain come before any talk of a covered area. A drawing that assumes a finished lane is how the budget breaks.
On this ground
We read the Gadap papers against the ground and we show you the line where they do not match.
Tariq Mansoor Bangash owns Maymarian. Gadap work is run from First R1 Lane, A42, not from a site hut with no name on the gate.
Gadap is the edge beyond Maymar. Some plots are a short run from the office. Some are not. We say which, after the visit, before we promise a weekly walk.
Gadap land is not one soil. Fill, water, and whether a road exists in the rain come before any talk of a covered area. A drawing that assumes a finished lane is how the budget breaks.
Do you build 5 marla houses in Gadap?
Yes. Call 0321-2000130 or 0321-2000690 after the plot is measured. We give the labor rate or the rate with material for that house.
Is the society office the same as yours?
No. We build houses. Allotment of scheme plots is a different door, including in Gadap.
How do payments work on a Gadap house?
Against a completed stage. You are not asked to fund a silent month.
How do we start house construction in Gadap?
WhatsApp 0321-2000130 with the plot number and the lane. The first meeting is a visit. The written scope comes after that.
Call for the rate
Ask for the written scope. That page becomes the contract. Labor rate or with material. The figure is on the phone.


