Maymarian Builders And Developers Company
Skip to content
Maymarian Builders And Developers Company
400 square yard plot, House construction in Gulshan-e-Maymar, Karachi

Gulshan-e-Maymar · Karachi

House construction for a 400 square yard plot in Gulshan-e-Maymar.

Neighbours have already built. Your house has to live next to them, not in a brochure.

What a 400 square yard plot means in Gulshan-e-Maymar

Four hundred square yards in Gulshan-e-Maymar is a full residential plot: the house, a court, and a place for the car without deleting a bedroom to get them.

What usually goes wrong

The mistake is roofing the whole yard because the land is there. You then pay to cool rooms you do not sit in.

Labor rate

Labor on 400 yards is priced from the covered area we agree, not from the empty ground around it. A labor rate means Maymarian builds and you arrange the material: cement, steel, brick, sand, and crush. You still need a drawing, because labor on the wrong plan is wasted money.

With material

With material, a longer roof and a second bath are real quantities of steel and cement. They are written down, not assumed from the yardage. With material means labor and material are one contract. We buy what the scope names, and you are not running to the market between the footing and the slab.

What moves the figure

In Gulshan-e-Maymar the figure moves with covered area, one floor or two, whether the contract stops at grey structure, how much fill is in the hole, and whether you chose labor only or material with it.

Have this ready when you call

  1. 01

    The plot papers, and the yardage written on them.

  2. 02

    The lane, so we know how concrete and steel arrive in Gulshan-e-Maymar.

  3. 03

    How many people sleep there, and whether the house is one floor or two.

  4. 04

    Whether you want a labor rate or a contract with material.

Labor rate or with material

Call for the Gulshan-e-Maymar rate.

Maymarian builds Karachi residential houses on 80, 120, 240, 400, 600, 800, and 1,000 square yard plots. You can take a labor rate, or a contract with material. The figure is given on the phone, for this plot.

Labor rate

We build. You arrange the material. The labor rate follows the covered area on the Gulshan-e-Maymar plot.

With material

Labor and material in one contract. Cement, steel, and the rest sit in the scope we read with you.

What you are walking into

  1. 01

    A per-foot number arrived with no drawing attached.

  2. 02

    Two contractors have walked past the gate and neither asked where the sewer sits.

  3. 03

    The family is ready to move and the papers still do not match the ground.

What changes after the visit

  1. 01

    You can stop at a written grey-structure line and finish later.

  2. 02

    Steel, slab, and brick are stages you can see before you pay the next one.

  3. 03

    Plots from 80 to 1,000 square yards get their own section. We do not scale one plan and hope.

After keys

  • A small office, but the same people who sat in the first meeting walked the slab with us.

    Ahmed Raza, Bungalow Eleven, Gulshan-e-Maymar

  • They stayed on site until the snag list was closed. Handover matched the drawings we signed.

    Imran Habib, Azure House, Clifton

  • Weekly reports, staged payments, no disappearing act. That is why we used them again.

    Tariq Farhan, Palm Court, Seaview

The office

The office address is First R1 Lane, A42, Gulshan-e-Maymar, Karachi.

Tariq Mansoor Bangash, Owner

400 square yard house in Gulshan-e-Maymar

A 400 square yard house in Gulshan-e-Maymar is a full residential plot, not a stretched 240. The court, the car turning, and the rooms the family named have to be drawn before anyone talks about filling the yard.

We build 400 square yard houses across Karachi on a labor rate or with material. House construction in Gulshan-e-Maymar gets its rate when you call 0321-2000130 or 0321-2000690. The number depends on covered area, and it is not on this page.

On a Maymar plot the first argument is usually the covered area, not the facade. A 120 yard house and a 240 yard house do not share a section or a stair. We measure the plot, including the cut at the lane, before anyone talks about a front elevation.

On this ground

If Gulshan-e-Maymar is a society, we are still the builder. Allotment is their door.

Materials for Gulshan-e-Maymar follow the road you have, including the week it is dug up.

The office sits inside Gulshan-e-Maymar, off the Super Highway side of north Karachi. Clients usually arrive with a plot number and a lane, not with a mood board. We can walk most Maymar plots without turning the visit into a trip.

Maymar is a planned residential scheme launched in the 1980s. Roads, plot lines, and neighbours already exist. The useful questions are the width of your lane, whether the plot is filled, where the sewer sits, and how much covered area the family actually needs. People ask which sector is best. A sector is not a ranking. Two plots on the same road can differ by a metre of fill.

Gulshan-e-Maymar the housing scheme was planned by Maymar Housing Services. Maymarian builds houses. Those are different names, and this office does not sell society plots.

What is the rate for a 400 square yard house in Gulshan-e-Maymar?

Call 0321-2000130 or 0321-2000690. Ask for the labor rate or the rate with material. WhatsApp is on 0321-2000130. We give the figure for this plot, not a printed card.

Can I stop at grey structure and finish later?

Yes, if that is the scope. The slab levels, toilet drops, and future stair are decided in the concrete, so a later finish is not a discovery.

How do I get the house construction rate in Gulshan-e-Maymar?

Call 0321-2000130 or 0321-2000690. Ask for the labor rate or the rate with material. The figure follows the covered area on your plot.

Can you build a 240 square yard house in Gulshan-e-Maymar?

Yes, when the plot is actually 240 on the ground. We check the papers against the lane before we draw the covered area.

Call for the rate

If the plot is already yours, message us. If you need a society plot allotted, this is the wrong door. Labor rate or with material. The figure is on the phone.