Maymarian Builders And Developers Company
Skip to content
Maymarian Builders And Developers Company
80 square yard plot, House construction in Korangi, Karachi

Korangi · Karachi

House construction for an 80 square yard plot in Korangi.

You are choosing between a finished house and a pause at grey structure, and nobody has asked the covered area.

What an 80 square yard plot means in Korangi

On 80 square yards in Korangi you can have a real room, a stair if the house is two floors, and a kitchen that is not the corridor. A car fits only if the lane allows the cut. A foyer does not fit.

What usually goes wrong

The usual mistake is pasting a 240 yard plan onto 80 yards until every bedroom is a passage. House construction here gets its own section.

Labor rate

Labor on 80 yards is a short job, so a wrong stair shows up immediately. A labor rate means Maymarian builds and you arrange the material: cement, steel, brick, sand, and crush. You still need a drawing, because labor on the wrong plan is wasted money.

With material

The material list is smaller than a 240, and it is still specific: the steel in that stair and the brick in those rooms, not a rate copied from a bigger house. With material means labor and material are one contract. We buy what the scope names, and you are not running to the market between the footing and the slab.

What moves the figure

In Korangi the figure moves with covered area, one floor or two, whether the contract stops at grey structure, how much fill is in the hole, and whether you chose labor only or material with it.

Have this ready when you call

  1. 01

    The plot papers, and the yardage written on them.

  2. 02

    The lane, so we know how concrete and steel arrive in Korangi.

  3. 03

    How many people sleep there, and whether the house is one floor or two.

  4. 04

    Whether you want a labor rate or a contract with material.

Labor rate or with material

Call for the Korangi rate.

Maymarian builds Karachi residential houses on 80, 120, 240, 400, 600, 800, and 1,000 square yard plots. You can take a labor rate, or a contract with material. The figure is given on the phone, for this plot.

Labor rate

We build. You arrange the material. The labor rate follows the covered area on the Korangi plot.

With material

Labor and material in one contract. Cement, steel, and the rest sit in the scope we read with you.

What you are walking into

  1. 01

    A per-foot number arrived with no drawing attached.

  2. 02

    Neighbours have built to the line, and the plan ignores them.

  3. 03

    A house construction figure with no covered area is a sentence, not a budget.

What changes after the visit

  1. 01

    Steel, slab, and brick are stages you can see before you pay the next one.

  2. 02

    The same names are on the drawing and on the site walk.

  3. 03

    You can stop at a written grey-structure line and finish later.

After keys

  • A small office, but the same people who sat in the first meeting walked the slab with us.

    Ahmed Raza, Bungalow Eleven, Gulshan-e-Maymar

  • They stayed on site until the snag list was closed. Handover matched the drawings we signed.

    Imran Habib, Azure House, Clifton

  • Weekly reports, staged payments, no disappearing act. That is why we used them again.

    Tariq Farhan, Palm Court, Seaview

The office

Handover is a snag list and a named contact. The photograph is not the end of the job.

Tariq Mansoor Bangash, Owner

80 square yard house in Korangi

An 80 square yard house in Korangi cannot wear a 240 yard plan. The stair, the car, and one real room have to be drawn for this footprint, or the house becomes a corridor with a bed in it.

An 80 square yard house in Korangi can be a labor rate, or a contract with material. Covered area and the lane move the figure. Call 0321-2000130 or 0321-2000690 and we will give you that rate. It is not printed on this page.

House construction in Korangi follows this ground. Korangi plots vary from settled lanes to edges that are still finding their levels. We do not reuse a Maymar footing detail until we have stood on the plot.

On this ground

Materials for Korangi follow the road you have, including the week it is dug up.

If Korangi is a society, we are still the builder. Allotment is their door.

Korangi is a planned haul from the Gulshan-e-Maymar office. The programme includes that road. It should not appear as a surprise in month four.

Korangi plots vary from settled lanes to edges that are still finding their levels. We do not reuse a Maymar footing detail until we have stood on the plot.

Can you build on an 80 square yard plot in Korangi?

Yes. Call 0321-2000130 or 0321-2000690 for the labor rate or the rate with material. WhatsApp is on 0321-2000130. The plan is drawn for 80 yards, not shrunk from a larger house.

How do we start house construction in Korangi?

WhatsApp 0321-2000130 with the plot number and the lane. The first meeting is a visit. The written scope comes after that.

Do you build only large houses in Korangi?

No. Eighty yards, a three-room house, and a 240 are different jobs. All of them need a real plan.

What does house construction in Korangi cost?

Covered area, grey structure versus a finished house, fill, and the lane all move the figure. We write it after a visit. We do not give a per-yard rate on the phone.

Call for the rate

Send the plot number. Say the yardage. The visit is next. Labor rate or with material. The figure is on the phone.