What an 80 square yard plot means in Gadap
On 80 square yards in Gadap you can have a real room, a stair if the house is two floors, and a kitchen that is not the corridor. A car fits only if the lane allows the cut. A foyer does not fit.
What usually goes wrong
The usual mistake is pasting a 240 yard plan onto 80 yards until every bedroom is a passage. Renovation here gets its own section.
Labor rate
Labor on 80 yards is a short job, so a wrong stair shows up immediately. A labor rate covers the people who open, rebuild, and plaster. You arrange cement, steel, and brick if the structure needs them. We do not price a paint job as a new house, and we do not price a new slab as paint.
With material
The material list is smaller than a 240, and it is still specific: the steel in that stair and the brick in those rooms, not a rate copied from a bigger house. With material, replacement of a bath, a lintel, or a slab is in one scope. You can see which lines are labor and which lines are material before work starts.
What moves the figure
Renovation in Gadap moves with what we find in the wall, whether an extra floor is even possible, and whether you are asking for labor only or material with it.
Have this ready when you call
- 01
Photographs of the house as it stands, and the year it was built if you know it.
- 02
What must keep working during the job, especially a bathroom.
- 03
Whether you want another floor. That is a look at the existing slab.
- 04
Labor rate or with material.
Labor rate or with material
Call for the Gadap rate.
Maymarian builds Karachi residential houses on 80, 120, 240, 400, 600, 800, and 1,000 square yard plots. You can take a labor rate, or a contract with material. The figure is given on the phone, for this plot.
Labor rate
We build. You arrange the material. The labor rate follows the covered area on the Gadap plot.
With material
Labor and material in one contract. Cement, steel, and the rest sit in the scope we read with you.
What you are walking into
- 01
The bathroom failed years ago and every later coat made it harder to see.
- 02
The quote assumes an empty house and a free lane.
- 03
A wet slab is about to receive a floor finish.
What changes after the visit
- 01
Work is staged so you are not funding a full refit to learn where the leak is.
- 02
Incomplete work is listed as a gap, then priced.
- 03
You are not funding a full interior to find a leak.
After keys
Weekly reports, staged payments, no disappearing act. That is why we used them again.
Tariq Farhan, Palm Court, Seaview
A small office, but the same people who sat in the first meeting walked the slab with us.
Ahmed Raza, Bungalow Eleven, Gulshan-e-Maymar
They stayed on site until the snag list was closed. Handover matched the drawings we signed.
Imran Habib, Azure House, Clifton
The office
If the papers and the ground disagree, we stop before excavation. A fast start that has to be undone is not a saving.
Tariq Mansoor Bangash, Owner
80 square yard house in Gadap
An 80 square yard house in Gadap cannot wear a 240 yard plan. The stair, the car, and one real room have to be drawn for this footprint, or the house becomes a corridor with a bed in it.
An 80 square yard house in Gadap can be a labor rate, or a contract with material. Covered area and the lane move the figure. Call 0321-2000130 or 0321-2000690 and we will give you that rate. It is not printed on this page.
Renovation in Gadap follows this ground. Gadap land is not one soil. Fill, water, and whether a road exists in the rain come before any talk of a covered area. A drawing that assumes a finished lane is how the budget breaks.
On this ground
If the Gadap plot is filled, the footing follows the soil in the hole. A detail borrowed from another block is only a guess.
If Gadap is a society, we are still the builder. Allotment is their door.
Gadap is the edge beyond Maymar. Some plots are a short run from the office. Some are not. We say which, after the visit, before we promise a weekly walk.
Gadap land is not one soil. Fill, water, and whether a road exists in the rain come before any talk of a covered area. A drawing that assumes a finished lane is how the budget breaks.
Can you build on an 80 square yard plot in Gadap?
Yes. Call 0321-2000130 or 0321-2000690 for the labor rate or the rate with material. WhatsApp is on 0321-2000130. The plan is drawn for 80 yards, not shrunk from a larger house.
What if the house in Gadap was never finished?
We write a list of what is built and what was only planned, and we price that gap. An incomplete house is not described as a coat of paint.
Who carries out the renovation?
Maymarian Builders And Developers Company, owned by Tariq Mansoor Bangash, from First R1 Lane, A42, Gulshan-e-Maymar.
Do you fix damp?
We open it. If the lane is the source, tiles are not the repair.
Call for the rate
Call 0321-2000130 or 0321-2000690. WhatsApp only the first. Labor rate or with material. The figure is on the phone.


