Maymarian Builders And Developers Company
Skip to content
Maymarian Builders And Developers Company
three-room house, Renovation in Scheme 33, Karachi

Scheme 33 · Karachi

Renovation for a three-room house in Scheme 33.

An incomplete house is being described as a renovation, and half of it was never built.

What a three-room house means in Scheme 33

A three-room house in Scheme 33 needs light, a kitchen that is not a corridor, and a stair that is not a ladder. Name who sleeps in each room before the drawing starts.

What usually goes wrong

Spending the third bedroom on a double-height hall. The brief then becomes two rooms and a foyer.

Labor rate

Labor follows three rooms. We do not price a villa and then delete a wing. A labor rate covers the people who open, rebuild, and plaster. You arrange cement, steel, and brick if the structure needs them. We do not price a paint job as a new house, and we do not price a new slab as paint.

With material

Material follows the same three rooms, including the stair if the house is two floors. With material, replacement of a bath, a lintel, or a slab is in one scope. You can see which lines are labor and which lines are material before work starts.

What moves the figure

Renovation in Scheme 33 moves with what we find in the wall, whether an extra floor is even possible, and whether you are asking for labor only or material with it.

Have this ready when you call

  1. 01

    Photographs of the house as it stands, and the year it was built if you know it.

  2. 02

    What must keep working during the job, especially a bathroom.

  3. 03

    Whether you want another floor. That is a look at the existing slab.

  4. 04

    Labor rate or with material.

Labor rate or with material

Call for the Scheme 33 rate.

Maymarian builds Karachi residential houses on 80, 120, 240, 400, 600, 800, and 1,000 square yard plots. You can take a labor rate, or a contract with material. The figure is given on the phone, for this plot.

Labor rate

We build. You arrange the material. The labor rate follows the covered area on the Scheme 33 plot.

With material

Labor and material in one contract. Cement, steel, and the rest sit in the scope we read with you.

What you are walking into

  1. 01

    Repair and rebuild are one number, so both are wrong.

  2. 02

    Every coat made the bath harder to understand.

  3. 03

    The quote assumes an empty house and a free lane.

What changes after the visit

  1. 01

    A cracked beam is shown, not boxed.

  2. 02

    If the frame deserves to stay, we keep it. If it does not, we say why.

  3. 03

    One bathroom stays in use when you are living there.

After keys

  • Weekly reports, staged payments, no disappearing act. That is why we used them again.

    Tariq Farhan, Palm Court, Seaview

  • They stayed on site until the snag list was closed. Handover matched the drawings we signed.

    Imran Habib, Azure House, Clifton

  • A small office, but the same people who sat in the first meeting walked the slab with us.

    Ahmed Raza, Bungalow Eleven, Gulshan-e-Maymar

The office

We have been in operation since 2014. Fewer houses, so a slab still has a name on it.

Tariq Mansoor Bangash, Owner

three room house in Scheme 33

A three-room house in Scheme 33 is a real brief. It needs light, a kitchen that is not a corridor, and a stair that is not a ladder. It is not a villa that lost a wing.

Families ask for three rooms and are shown a foyer. Renovation here starts by naming who sleeps where, then the covered area. The cost follows that drawing, not the other way around.

Renovation here is usually an occupied ground floor with a family upstairs, or a house that was left at plaster. Work is staged so one bathroom stays usable. That is a site problem, not a brochure line.

On this ground

We read the Scheme 33 papers against the ground and we show you the line where they do not match.

Deliveries for a Scheme 33 house follow the road you have, including the weeks it is dug up for someone else’s connection.

Travel from our Gulshan-e-Maymar office is short enough that the same site engineer can hold the job. Access inside Scheme 33 depends on the block. We visit before we programme concrete.

Some Scheme 33 land is filled. Footings follow that fact. We do not reuse a Maymar footing detail on a plot that sponges underfoot. The plinth is set to the road you have, including the monsoon level of that road.

Can you plan a three-room house in Scheme 33?

Yes. Three rooms stay three rooms. Call 0321-2000130 or 0321-2000690 for the labor rate or the rate with material.

Is a kitchen remodel a renovation?

Only if the brief is the kitchen. A wet roof hiding under that remodel is a different stage.

Do you travel to Scheme 33 for a repair?

Yes, when the visit is justified. The office is in Gulshan-e-Maymar.

Will you keep the old structure?

When it deserves to stay. You see the opened slab and any cracked beam before we cover them again.

Call for the rate

Talk to the office that will still answer when the slab is poured. Labor rate or with material. The figure is on the phone.