What an 800 square yard plot means in Scheme 45
Eight hundred square yards in Scheme 45 can be two wings, if the family needs two wings. Otherwise it is one house and open ground. The plot size is not a reason to double the roof.
What usually goes wrong
A foyer wing is the usual waste. It spends a bedroom on a space nobody sits in at 3 p.m.
Labor rate
We price labor for the rooms that are lived in. A ceremonial hall is a choice you can see in the scope. A labor rate covers the people who open, rebuild, and plaster. You arrange cement, steel, and brick if the structure needs them. We do not price a paint job as a new house, and we do not price a new slab as paint.
With material
With material, that hall is steel, slab, and brick. If you do not want it, it does not enter the contract. With material, replacement of a bath, a lintel, or a slab is in one scope. You can see which lines are labor and which lines are material before work starts.
What moves the figure
Renovation in Scheme 45 moves with what we find in the wall, whether an extra floor is even possible, and whether you are asking for labor only or material with it.
Have this ready when you call
- 01
Photographs of the house as it stands, and the year it was built if you know it.
- 02
What must keep working during the job, especially a bathroom.
- 03
Whether you want another floor. That is a look at the existing slab.
- 04
Labor rate or with material.
Labor rate or with material
Call for the Scheme 45 rate.
Maymarian builds Karachi residential houses on 80, 120, 240, 400, 600, 800, and 1,000 square yard plots. You can take a labor rate, or a contract with material. The figure is given on the phone, for this plot.
Labor rate
We build. You arrange the material. The labor rate follows the covered area on the Scheme 45 plot.
With material
Labor and material in one contract. Cement, steel, and the rest sit in the scope we read with you.
What you are walking into
- 01
The empty-house price arrived for a full house.
- 02
Every coat made the bath harder to understand.
- 03
You cannot tell what is built and what was only hoped for.
What changes after the visit
- 01
We open before we price the finish.
- 02
If the frame deserves to stay, we keep it. If it does not, we say why.
- 03
One bathroom stays usable when the family is in the house.
After keys
Weekly reports, staged payments, no disappearing act. That is why we used them again.
Tariq Farhan, Palm Court, Seaview
A small office, but the same people who sat in the first meeting walked the slab with us.
Ahmed Raza, Bungalow Eleven, Gulshan-e-Maymar
They stayed on site until the snag list was closed. Handover matched the drawings we signed.
Imran Habib, Azure House, Clifton
The office
Maymarian Builders And Developers Company is owned by Tariq Mansoor Bangash. The office is First R1 Lane, A42, Gulshan-e-Maymar, Karachi.
Tariq Mansoor Bangash, Owner
800 square yard house in Scheme 45
An 800 square yard house in Scheme 45 is large enough to waste a wing on a foyer. We check who lives there before we spend the yardage. The plot size is not a reason to double the roof.
The labor rate and the with-material rate for 800 yards are different numbers, and both move with the drawing. Call 0321-2000130 or 0321-2000690. Renovation here is a Karachi residential house, quoted for this plot.
Renovation in Scheme 45 follows this ground. Scheme 45 plots are often compared with Scheme 33 and with Maymar. The comparison fails when the fill is different. Footings follow the hole we dig, not the neighbouring scheme’s detail.
On this ground
From First R1 Lane, a Scheme 45 plot is a visit, not a pin on a brochure.
Search interest in Scheme 45 is usually a plot the family already owns. That is the job we take.
Scheme 45 sits on the same side of the city as our office. We still visit before we programme a pour, because the internal road may not match the plan.
Scheme 45 plots are often compared with Scheme 33 and with Maymar. The comparison fails when the fill is different. Footings follow the hole we dig, not the neighbouring scheme’s detail.
Can I get an 800 square yard rate in Scheme 45?
Yes, by phone. Call 0321-2000130 or 0321-2000690 and say labor rate or with material. We do not print an 800 yard card.
Will you add a floor in Scheme 45?
Only after the slab is seen.
What if the house in Scheme 45 was never finished?
We write a list of what is built and what was only planned, and we price that gap. An incomplete house is not described as a coat of paint.
Can you work while we live in the Scheme 45 house?
Often, yes. The programme leaves one bathroom usable and stages the dust. If the job cannot be lived in, we say so before we start.
Call for the rate
Ask for a written scope after the visit. That page is what the contract is built from. Labor rate or with material. The figure is on the phone.


