Maymarian Builders And Developers Company
Skip to content
Maymarian Builders And Developers Company
200 square yard plot, Bungalow in Gadap, Karachi

Gadap · Karachi

Bungalow for a 200 square yard plot in Gadap.

The servant yard was the first thing deleted to make the elevation work.

What a 200 square yard plot means in Gadap

Two hundred yards in Gadap can take the rooms a family names, plus one decision: the extra room, or the light. Both at once is how the plan gets worse.

What usually goes wrong

People invent a fourth room to use the yardage. The house then has no wall that can hold a bed and a window.

Labor rate

Labor follows the rooms you keep, not the rooms a relative added in the margin. On a labor rate we build the bungalow and you arrange the material. The veranda and the stair are still drawn first. A labor gang cannot invent them on site without costing you the room they occupy.

With material

Material follows the same rooms. An extra bathroom that was never drawn becomes an extra slab and an extra stack of steel. With material, we supply what the bungalow scope lists and we build it. Shade, the roof, and the wet areas are in that list. A glass front is not a substitute for a veranda that works in June.

What moves the figure

A bungalow rate in Gadap moves with the covered area, whether the car actually fits the lane, and whether the contract is labor only or with material.

Have this ready when you call

  1. 01

    The plot dimensions, measured, including any cut the road has taken.

  2. 02

    Who lives in the house, so the rooms are not a foyer with beds around it.

  3. 03

    Whether the car must enter, and from which side.

  4. 04

    Labor rate or with material.

Labor rate or with material

Call for the Gadap rate.

Maymarian builds Karachi residential houses on 80, 120, 240, 400, 600, 800, and 1,000 square yard plots. You can take a labor rate, or a contract with material. The figure is given on the phone, for this plot.

Labor rate

We build. You arrange the material. The labor rate follows the covered area on the Gadap plot.

With material

Labor and material in one contract. Cement, steel, and the rest sit in the scope we read with you.

What you are walking into

  1. 01

    The bungalow is sealed toward the only breeze the lane gets.

  2. 02

    The car symbol fits. The car does not.

  3. 03

    The kitchen is a corridor behind the show rooms.

What changes after the visit

  1. 01

    The veranda is drawn toward the breeze this lane has, even when that is the side.

  2. 02

    The car is drawn against the real turning.

  3. 03

    Afternoon rooms are placed by asking who is home at 3 p.m.

After keys

  • A small office, but the same people who sat in the first meeting walked the slab with us.

    Ahmed Raza, Bungalow Eleven, Gulshan-e-Maymar

  • Weekly reports, staged payments, no disappearing act. That is why we used them again.

    Tariq Farhan, Palm Court, Seaview

  • They stayed on site until the snag list was closed. Handover matched the drawings we signed.

    Imran Habib, Azure House, Clifton

The office

A Maymar lane and a coastal house are specified differently. The office writing your set is the one that has stood on both.

Tariq Mansoor Bangash, Owner

200 square yard house in Gadap

A 200 square yard plot in Gadap is the awkward middle. It invites one extra room that ruins the others. We would rather draw the rooms the family named than invent a fourth to use up the yardage.

A 200 square yard house in Gadap is priced two ways: labor rate, or with material. Fill and covered area move both. Call 0321-2000130 or 0321-2000690 for the rate on this plot.

Bungalow in Gadap follows this ground. Gadap land is not one soil. Fill, water, and whether a road exists in the rain come before any talk of a covered area. A drawing that assumes a finished lane is how the budget breaks.

On this ground

A Gadap price asked for on the phone is a guess. The visit is what turns it into a scope.

Gadap sits in the part of Karachi this office already works. We do not fly a crew in for a single slab.

Gadap is the edge beyond Maymar. Some plots are a short run from the office. Some are not. We say which, after the visit, before we promise a weekly walk.

Gadap land is not one soil. Fill, water, and whether a road exists in the rain come before any talk of a covered area. A drawing that assumes a finished lane is how the budget breaks.

Is a 200 square yard house the same plan as a 240?

No. Two hundred yards in Gadap gets its own section. Scaling a larger plan is how a room becomes a passage.

How long does a Gadap bungalow take?

Most take twelve to twenty-four months after the scope is signed, depending on covered area and finish.

How do we start?

WhatsApp 0321-2000130 with the plot and the rooms. Or call 0321-2000690.

Do you build family bungalows in Gadap?

Yes. A single house with a veranda, planned for the plot, not copied from a villa.

Call for the rate

Bring the papers to First R1 Lane, A42. Labor rate or with material. The figure is on the phone.