Maymarian Builders And Developers Company
Skip to content
Maymarian Builders And Developers Company
Family bungalow under construction in Scheme 45, Karachi

Scheme 45 · Karachi

A Scheme 45 bungalow with a quiet bedroom end.

You need the house to be usable in June without a generator running the whole plan.

How bungalow is scoped in Scheme 45

Bungalow in Scheme 45 is priced as a labor rate, or as a contract with material. The figure follows this plot. It is given on the phone, not on a printed card.

What this work includes

A bungalow in Scheme 45 is one family house on its own ground. The useful rooms are the veranda, the car turning, and a kitchen that gets light. A plan copied from a larger villa usually fails on this plot.

Labor rate

On a labor rate we build the bungalow and you arrange the material. The veranda and the stair are still drawn first. A labor gang cannot invent them on site without costing you the room they occupy.

With material

With material, we supply what the bungalow scope lists and we build it. Shade, the roof, and the wet areas are in that list. A glass front is not a substitute for a veranda that works in June.

What moves the figure

A bungalow rate in Scheme 45 moves with the covered area, whether the car actually fits the lane, and whether the contract is labor only or with material.

Have this ready when you call

  1. 01

    The plot dimensions, measured, including any cut the road has taken.

  2. 02

    Who lives in the house, so the rooms are not a foyer with beds around it.

  3. 03

    Whether the car must enter, and from which side.

  4. 04

    Labor rate or with material.

Labor rate or with material

Call for the Scheme 45 rate.

Maymarian builds Karachi residential houses on 80, 120, 240, 400, 600, 800, and 1,000 square yard plots. You can take a labor rate, or a contract with material. The figure is given on the phone, for this plot.

Labor rate

We build. You arrange the material. The labor rate follows the covered area on the Scheme 45 plot.

With material

Labor and material in one contract. Cement, steel, and the rest sit in the scope we read with you.

What you are walking into

  1. 01

    Five marla manners are being stretched over a speech about villas.

  2. 02

    The bungalow is really a ground floor waiting for a floor the slab cannot take.

  3. 03

    The veranda is a strip of leftover tile, not a room.

What changes after the visit

  1. 01

    The veranda faces the breeze this lane has.

  2. 02

    One court, not two performances.

  3. 03

    The bungalow is a single house with a name on the contract, not a reduced villa.

After keys

  • They stayed on site until the snag list was closed. Handover matched the drawings we signed.

    Imran Habib, Azure House, Clifton

  • Weekly reports, staged payments, no disappearing act. That is why we used them again.

    Tariq Farhan, Palm Court, Seaview

  • A small office, but the same people who sat in the first meeting walked the slab with us.

    Ahmed Raza, Bungalow Eleven, Gulshan-e-Maymar

The office

If the papers and the ground disagree, we stop before excavation. A fast start that has to be undone is not a saving.

Tariq Mansoor Bangash, Owner

Bungalow in Scheme 45

A single-family bungalow in Scheme 45 should be cool at the veranda before it is impressive from the gate. Shade is drawn first. Glass is argued second.

The best house builders, in practice, are the ones who still walk the slab. That is the offer from this office.

Bungalow in Scheme 45 follows this ground. Scheme 45 plots are often compared with Scheme 33 and with Maymar. The comparison fails when the fill is different. Footings follow the hole we dig, not the neighbouring scheme’s detail.

On this ground

A house in Scheme 45 should still be legible in ten years.

Search interest in Scheme 45 is usually a plot the family already owns. That is the job we take.

Scheme 45 sits on the same side of the city as our office. We still visit before we programme a pour, because the internal road may not match the plan.

Scheme 45 plots are often compared with Scheme 33 and with Maymar. The comparison fails when the fill is different. Footings follow the hole we dig, not the neighbouring scheme’s detail.

Is a bungalow the same as house construction?

A bungalow is a single-family house. House construction is the wider contract. If you want this shape of house, say so and we scope that.

Do you build bungalows in Scheme 45?

Yes. A single-family house with a veranda, planned for the plot and the lane, not copied from a villa.

Do you take bungalow renovation as well as a new bungalow?

Renovation is its own contract. A new bungalow is this one. We do not mix the prices.

Call for the rate

Ask for the written scope. That page becomes the contract. Labor rate or with material. The figure is on the phone.