What a double storey house means in Federal B Area
A double storey in Federal B Area is decided in the first slab: the stair, the toilet drops, and the weight of the upper floor. If the house is already standing, the first job is to look at that slab.
What usually goes wrong
Promising the first floor later, on concrete nobody designed for it.
Labor rate
Labor for two floors includes the stair. A hole with no stair is not a complete structure. A labor rate on grey structure is the mason, the carpenter, the steel fixer, and the helpers. You supply cement, steel, brick, sand, and crush. The stair opening and the toilet drops still have to be in the drawing, or the labor builds a frame the finish cannot use.
With material
With material, the upper floor is in the steel of the first slab, or it is refused. It is not implied. With material, those same items are in our contract. Steel weight and slab thickness are why two grey-structure quotes on the same Federal B Area plot do not match. We name them before anyone orders.
What moves the figure
The grey-structure figure in Federal B Area moves with the hole we dig, the span of the lanter, whether another floor sits on it, and how much brickwork is inside the stop line.
Have this ready when you call
- 01
Plot papers and the yardage on the ground, not only in the chat.
- 02
Whether a floor will be added later. That decision is made in this slab.
- 03
Where the bathrooms are. The drops cannot be invented after the concrete.
- 04
Labor rate, or with material.
Labor rate or with material
Call for the Federal B Area rate.
Maymarian builds Karachi residential houses on 80, 120, 240, 400, 600, 800, and 1,000 square yard plots. You can take a labor rate, or a contract with material. The figure is given on the phone, for this plot.
Labor rate
We build. You arrange the material. The labor rate follows the covered area on the Federal B Area plot.
With material
Labor and material in one contract. Cement, steel, and the rest sit in the scope we read with you.
What you are walking into
- 01
Old foundations from a demolished house are still in the hole, and the programme ignores them.
- 02
The stair opening is a hole. The stair itself was left for someone else to invent.
- 03
The stair opening moved after the steel was cut.
What changes after the visit
- 01
Each stage is photographed, including the cover.
- 02
The frame stays regular. Complex concrete is a choice you can see in the price.
- 03
The stop line between structure and finish is a sentence in the scope.
After keys
They stayed on site until the snag list was closed. Handover matched the drawings we signed.
Imran Habib, Azure House, Clifton
Weekly reports, staged payments, no disappearing act. That is why we used them again.
Tariq Farhan, Palm Court, Seaview
A small office, but the same people who sat in the first meeting walked the slab with us.
Ahmed Raza, Bungalow Eleven, Gulshan-e-Maymar
The office
Maymarian Builders And Developers Company is owned by Tariq Mansoor Bangash. The office is First R1 Lane, A42, Gulshan-e-Maymar, Karachi.
Tariq Mansoor Bangash, Owner
double storey house in Federal B Area
A double storey house in Federal B Area is decided in the first slab. The stair, the toilet drops, and the weight of the upper floor have to be in the concrete. Promising the first floor later, on a slab nobody designed for it, is how the argument starts.
If the house is already standing and you want a floor added, that is a look at the existing structure, not a paint job. Grey structure either includes the upper floor now or it says the slab cannot take it.
Grey structure in Federal B Area follows this ground. A Federal B Area house sits against neighbours who are already there. Drainage, the party wall, and a bathroom that has to stay usable during renovation decide the first week.
On this ground
A house in Federal B Area should still be legible in ten years.
Federal B Area is supervised from Gulshan-e-Maymar, not from a site hut with no name.
Federal B Area streets are lived in. Deliveries and working hours are part of the method, not a footnote.
A Federal B Area house sits against neighbours who are already there. Drainage, the party wall, and a bathroom that has to stay usable during renovation decide the first week.
Do you build a double storey in Federal B Area?
Yes, when the structure is drawn for two floors. Call 0321-2000130 or 0321-2000690 for the labor rate or the rate with material. An extra floor on an old slab waits until we have seen that slab.
What if the Federal B Area plot is filled?
The footing follows the soil we find. We will not pour a borrowed detail on loose fill to keep a date.
Are photographs part of grey structure?
Yes. Cover and curing are in the note.
How do we start grey structure in Federal B Area?
WhatsApp 0321-2000130 with the plot and a photograph of the lane. We visit before we order steel.
Call for the rate
WhatsApp the plot number. We will say whether this is a job we should walk. Labor rate or with material. The figure is on the phone.