What a double storey house means in Federal B Area
A double storey in Federal B Area is decided in the first slab: the stair, the toilet drops, and the weight of the upper floor. If the house is already standing, the first job is to look at that slab.
What usually goes wrong
Promising the first floor later, on concrete nobody designed for it.
Labor rate
Labor for two floors includes the stair. A hole with no stair is not a complete structure. A labor rate means Maymarian builds and you arrange the material: cement, steel, brick, sand, and crush. You still need a drawing, because labor on the wrong plan is wasted money.
With material
With material, the upper floor is in the steel of the first slab, or it is refused. It is not implied. With material means labor and material are one contract. We buy what the scope names, and you are not running to the market between the footing and the slab.
What moves the figure
In Federal B Area the figure moves with covered area, one floor or two, whether the contract stops at grey structure, how much fill is in the hole, and whether you chose labor only or material with it.
Have this ready when you call
- 01
The plot papers, and the yardage written on them.
- 02
The lane, so we know how concrete and steel arrive in Federal B Area.
- 03
How many people sleep there, and whether the house is one floor or two.
- 04
Whether you want a labor rate or a contract with material.
Labor rate or with material
Call for the Federal B Area rate.
Maymarian builds Karachi residential houses on 80, 120, 240, 400, 600, 800, and 1,000 square yard plots. You can take a labor rate, or a contract with material. The figure is given on the phone, for this plot.
Labor rate
We build. You arrange the material. The labor rate follows the covered area on the Federal B Area plot.
With material
Labor and material in one contract. Cement, steel, and the rest sit in the scope we read with you.
What you are walking into
- 01
You are being hurried toward a start so the conversation does not have to include the plinth.
- 02
You were told the cost, then told the toilet drops were extra.
- 03
The servant yard disappeared between the first quote and the second.
What changes after the visit
- 01
Drainage, the lane, and the neighbour’s wall are in the first conversation.
- 02
Grey structure and a finished house are two scopes. You choose with the difference written down.
- 03
Yardage, covered area, and finish are three lines in the scope, not one.
After keys
They stayed on site until the snag list was closed. Handover matched the drawings we signed.
Imran Habib, Azure House, Clifton
Weekly reports, staged payments, no disappearing act. That is why we used them again.
Tariq Farhan, Palm Court, Seaview
A small office, but the same people who sat in the first meeting walked the slab with us.
Ahmed Raza, Bungalow Eleven, Gulshan-e-Maymar
The office
We are a construction company. Gulshan-e-Maymar the housing scheme is a different organisation. We do not allot society plots.
Tariq Mansoor Bangash, Owner
double storey house in Federal B Area
A double storey house in Federal B Area is decided in the first slab. The stair, the toilet drops, and the weight of the upper floor have to be in the concrete. Promising the first floor later, on a slab nobody designed for it, is how the argument starts.
If the house is already standing and you want a floor added, that is a look at the existing structure, not a paint job. House construction either includes the upper floor now or it says the slab cannot take it.
House construction in Federal B Area follows this ground. A Federal B Area house sits against neighbours who are already there. Drainage, the party wall, and a bathroom that has to stay usable during renovation decide the first week.
On this ground
Tariq Mansoor Bangash’s company takes Federal B Area work when the supervision is real.
If the Federal B Area plot is filled, the footing follows the soil in the hole. A detail borrowed from another block is only a guess.
Federal B Area streets are lived in. Deliveries and working hours are part of the method, not a footnote.
A Federal B Area house sits against neighbours who are already there. Drainage, the party wall, and a bathroom that has to stay usable during renovation decide the first week.
Do you build a double storey in Federal B Area?
Yes, when the structure is drawn for two floors. Call 0321-2000130 or 0321-2000690 for the labor rate or the rate with material. An extra floor on an old slab waits until we have seen that slab.
How do payments work on a Federal B Area house?
Against a completed stage. You are not asked to fund a silent month.
What does house construction in Federal B Area cost?
Covered area, grey structure versus a finished house, fill, and the lane all move the figure. We write it after a visit. We do not give a per-yard rate on the phone.
Do you design and build?
Yes. Architecture and construction sit in one office. The drawing and the wall have the same author.
Call for the rate
If the plot is already yours, message us. If you need a society plot allotted, this is the wrong door. Labor rate or with material. The figure is on the phone.