What a 200 square yard plot means in Korangi
Two hundred yards in Korangi can take the rooms a family names, plus one decision: the extra room, or the light. Both at once is how the plan gets worse.
What usually goes wrong
People invent a fourth room to use the yardage. The house then has no wall that can hold a bed and a window.
Labor rate
Labor follows the rooms you keep, not the rooms a relative added in the margin. A labor rate means Maymarian builds and you arrange the material: cement, steel, brick, sand, and crush. You still need a drawing, because labor on the wrong plan is wasted money.
With material
Material follows the same rooms. An extra bathroom that was never drawn becomes an extra slab and an extra stack of steel. With material means labor and material are one contract. We buy what the scope names, and you are not running to the market between the footing and the slab.
What moves the figure
In Korangi the figure moves with covered area, one floor or two, whether the contract stops at grey structure, how much fill is in the hole, and whether you chose labor only or material with it.
Have this ready when you call
- 01
The plot papers, and the yardage written on them.
- 02
The lane, so we know how concrete and steel arrive in Korangi.
- 03
How many people sleep there, and whether the house is one floor or two.
- 04
Whether you want a labor rate or a contract with material.
Labor rate or with material
Call for the Korangi rate.
Maymarian builds Karachi residential houses on 80, 120, 240, 400, 600, 800, and 1,000 square yard plots. You can take a labor rate, or a contract with material. The figure is given on the phone, for this plot.
Labor rate
We build. You arrange the material. The labor rate follows the covered area on the Korangi plot.
With material
Labor and material in one contract. Cement, steel, and the rest sit in the scope we read with you.
What you are walking into
- 01
A per-foot number arrived with no drawing attached.
- 02
Neighbours have built to the line, and the plan ignores them.
- 03
A house construction figure with no covered area is a sentence, not a budget.
What changes after the visit
- 01
Steel, slab, and brick are stages you can see before you pay the next one.
- 02
The same names are on the drawing and on the site walk.
- 03
You can stop at a written grey-structure line and finish later.
After keys
A small office, but the same people who sat in the first meeting walked the slab with us.
Ahmed Raza, Bungalow Eleven, Gulshan-e-Maymar
They stayed on site until the snag list was closed. Handover matched the drawings we signed.
Imran Habib, Azure House, Clifton
Weekly reports, staged payments, no disappearing act. That is why we used them again.
Tariq Farhan, Palm Court, Seaview
The office
Handover is a snag list and a named contact. The photograph is not the end of the job.
Tariq Mansoor Bangash, Owner
200 square yard house in Korangi
A 200 square yard plot in Korangi is the awkward middle. It invites one extra room that ruins the others. We would rather draw the rooms the family named than invent a fourth to use up the yardage.
A 200 square yard house in Korangi is priced two ways: labor rate, or with material. Fill and covered area move both. Call 0321-2000130 or 0321-2000690 for the rate on this plot.
House construction in Korangi follows this ground. Korangi plots vary from settled lanes to edges that are still finding their levels. We do not reuse a Maymar footing detail until we have stood on the plot.
On this ground
Materials for Korangi follow the road you have, including the week it is dug up.
If Korangi is a society, we are still the builder. Allotment is their door.
Korangi is a planned haul from the Gulshan-e-Maymar office. The programme includes that road. It should not appear as a surprise in month four.
Korangi plots vary from settled lanes to edges that are still finding their levels. We do not reuse a Maymar footing detail until we have stood on the plot.
Is a 200 square yard house the same plan as a 240?
No. Two hundred yards in Korangi gets its own section. Scaling a larger plan is how a room becomes a passage.
How do we start house construction in Korangi?
WhatsApp 0321-2000130 with the plot number and the lane. The first meeting is a visit. The written scope comes after that.
Do you build only large houses in Korangi?
No. Eighty yards, a three-room house, and a 240 are different jobs. All of them need a real plan.
What does house construction in Korangi cost?
Covered area, grey structure versus a finished house, fill, and the lane all move the figure. We write it after a visit. We do not give a per-yard rate on the phone.
Call for the rate
Send the plot number. Say the yardage. The visit is next. Labor rate or with material. The figure is on the phone.


