Maymarian Builders And Developers Company
Skip to content
Maymarian Builders And Developers Company
200 square yard plot, House construction in Malir, Karachi

Malir · Karachi

House construction for a 200 square yard plot in Malir.

You are choosing between a finished house and a pause at grey structure, and nobody has asked the covered area.

What a 200 square yard plot means in Malir

Two hundred yards in Malir can take the rooms a family names, plus one decision: the extra room, or the light. Both at once is how the plan gets worse.

What usually goes wrong

People invent a fourth room to use the yardage. The house then has no wall that can hold a bed and a window.

Labor rate

Labor follows the rooms you keep, not the rooms a relative added in the margin. A labor rate means Maymarian builds and you arrange the material: cement, steel, brick, sand, and crush. You still need a drawing, because labor on the wrong plan is wasted money.

With material

Material follows the same rooms. An extra bathroom that was never drawn becomes an extra slab and an extra stack of steel. With material means labor and material are one contract. We buy what the scope names, and you are not running to the market between the footing and the slab.

What moves the figure

In Malir the figure moves with covered area, one floor or two, whether the contract stops at grey structure, how much fill is in the hole, and whether you chose labor only or material with it.

Have this ready when you call

  1. 01

    The plot papers, and the yardage written on them.

  2. 02

    The lane, so we know how concrete and steel arrive in Malir.

  3. 03

    How many people sleep there, and whether the house is one floor or two.

  4. 04

    Whether you want a labor rate or a contract with material.

Labor rate or with material

Call for the Malir rate.

Maymarian builds Karachi residential houses on 80, 120, 240, 400, 600, 800, and 1,000 square yard plots. You can take a labor rate, or a contract with material. The figure is given on the phone, for this plot.

Labor rate

We build. You arrange the material. The labor rate follows the covered area on the Malir plot.

With material

Labor and material in one contract. Cement, steel, and the rest sit in the scope we read with you.

What you are walking into

  1. 01

    The estimate treats fill as a line item you can delete if you feel brave.

  2. 02

    The front elevation arrived before anyone measured the cut at the lane.

  3. 03

    You have been collecting rates, and each one assumes a different house.

What changes after the visit

  1. 01

    You can stop at a written grey-structure line and finish later.

  2. 02

    We say if the fill is a problem while it is still a hole.

  3. 03

    The same office draws the set and walks the slab.

After keys

  • They stayed on site until the snag list was closed. Handover matched the drawings we signed.

    Imran Habib, Azure House, Clifton

  • Weekly reports, staged payments, no disappearing act. That is why we used them again.

    Tariq Farhan, Palm Court, Seaview

  • A small office, but the same people who sat in the first meeting walked the slab with us.

    Ahmed Raza, Bungalow Eleven, Gulshan-e-Maymar

The office

Handover is a snag list and a named contact. The photograph is not the end of the job.

Tariq Mansoor Bangash, Owner

200 square yard house in Malir

A 200 square yard plot in Malir is the awkward middle. It invites one extra room that ruins the others. We would rather draw the rooms the family named than invent a fourth to use up the yardage.

A 200 square yard house in Malir is priced two ways: labor rate, or with material. Fill and covered area move both. Call 0321-2000130 or 0321-2000690 for the rate on this plot.

Malir building is about shade and a long roof more than a street facade. Orchard edges and newer housing sit in the same district. The house should be cool at the veranda before it is impressive from the gate.

On this ground

Malir is a lane, a fill, and a sewer position. Those three matter more than the sector’s reputation.

We read the Malir papers against the ground and we show you the line where they do not match.

Malir is a longer drive from Gulshan-e-Maymar than Scheme 33. We take the work when the job is large enough to justify the regular site presence.

Soil and standing water are not the same as a Maymar lane. Footings are confirmed on the plot. Trees that are already doing the cooling are kept if the plan can hold them.

Is a 200 square yard house the same plan as a 240?

No. Two hundred yards in Malir gets its own section. Scaling a larger plan is how a room becomes a passage.

Is the society office the same as yours?

No. We build houses. Allotment of scheme plots is a different door, including in Malir.

Can you build a 120 square yard house in Malir?

Yes. It gets its own plan. We do not shrink a larger house until the rooms stop working.

How do we start house construction in Malir?

WhatsApp 0321-2000130 with the plot number and the lane. The first meeting is a visit. The written scope comes after that.

Call for the rate

Book the walk while the fill is still the fill you saw. Labor rate or with material. The figure is on the phone.