What an 80 square yard plot means in Ahsanabad
On 80 square yards in Ahsanabad you can have a real room, a stair if the house is two floors, and a kitchen that is not the corridor. A car fits only if the lane allows the cut. A foyer does not fit.
What usually goes wrong
The usual mistake is pasting a 240 yard plan onto 80 yards until every bedroom is a passage. Renovation here gets its own section.
Labor rate
Labor on 80 yards is a short job, so a wrong stair shows up immediately. A labor rate covers the people who open, rebuild, and plaster. You arrange cement, steel, and brick if the structure needs them. We do not price a paint job as a new house, and we do not price a new slab as paint.
With material
The material list is smaller than a 240, and it is still specific: the steel in that stair and the brick in those rooms, not a rate copied from a bigger house. With material, replacement of a bath, a lintel, or a slab is in one scope. You can see which lines are labor and which lines are material before work starts.
What moves the figure
Renovation in Ahsanabad moves with what we find in the wall, whether an extra floor is even possible, and whether you are asking for labor only or material with it.
Have this ready when you call
- 01
Photographs of the house as it stands, and the year it was built if you know it.
- 02
What must keep working during the job, especially a bathroom.
- 03
Whether you want another floor. That is a look at the existing slab.
- 04
Labor rate or with material.
Labor rate or with material
Call for the Ahsanabad rate.
Maymarian builds Karachi residential houses on 80, 120, 240, 400, 600, 800, and 1,000 square yard plots. You can take a labor rate, or a contract with material. The figure is given on the phone, for this plot.
Labor rate
We build. You arrange the material. The labor rate follows the covered area on the Ahsanabad plot.
With material
Labor and material in one contract. Cement, steel, and the rest sit in the scope we read with you.
What you are walking into
- 01
Adding a floor skipped the slab.
- 02
A wet slab is about to receive a floor finish.
- 03
Dust and a family in the same stair.
What changes after the visit
- 01
The roof is its own stage. It is not hidden inside a tile package.
- 02
The lane is checked when the damp is low on the wall. Tiles are not the first answer.
- 03
Work is staged so you are not funding a full refit to learn where the leak is.
After keys
Weekly reports, staged payments, no disappearing act. That is why we used them again.
Tariq Farhan, Palm Court, Seaview
They stayed on site until the snag list was closed. Handover matched the drawings we signed.
Imran Habib, Azure House, Clifton
A small office, but the same people who sat in the first meeting walked the slab with us.
Ahmed Raza, Bungalow Eleven, Gulshan-e-Maymar
The office
Drawing and site sit in one office. The set you sign is the set we walk, including the week the detail is wrong.
Tariq Mansoor Bangash, Owner
80 square yard house in Ahsanabad
An 80 square yard house in Ahsanabad cannot wear a 240 yard plan. The stair, the car, and one real room have to be drawn for this footprint, or the house becomes a corridor with a bed in it.
An 80 square yard house in Ahsanabad can be a labor rate, or a contract with material. Covered area and the lane move the figure. Call 0321-2000130 or 0321-2000690 and we will give you that rate. It is not printed on this page.
We are often called after a previous mason has already closed a damp wall. The first week is opening, not finishing. If the damp is from the lane, tiles will not fix it.
On this ground
Ahsanabad is supervised from Gulshan-e-Maymar, not from a site hut with no name.
A house in Ahsanabad already has neighbours and a road level. The monsoon uses that road, whether the drawing mentions it or not.
Near enough to the Maymar office that supervision stays with the same people. Lanes can be narrow. The programme has to respect that, including where a mixer can actually stand.
The constraint is width, not drama. Excavation, shuttering, and curing are sequenced so the next house can still open its gate. That sequence is written down. It is not left to the day.
Can you build on an 80 square yard plot in Ahsanabad?
Yes. Call 0321-2000130 or 0321-2000690 for the labor rate or the rate with material. WhatsApp is on 0321-2000130. The plan is drawn for 80 yards, not shrunk from a larger house.
Do you add a floor in Ahsanabad?
Only after the existing slab has been seen. An extra floor is a structural decision, not a finish.
Will you keep the old structure?
When it deserves to stay. You see the opened slab and any cracked beam before we cover them again.
Can you keep the old structure?
When it deserves it. You see the opened work before it is covered.
Call for the rate
WhatsApp a photograph of the lane. We will tell you if a Saturday visit is worth it. Labor rate or with material. The figure is on the phone.


