What a double storey house means in Gadap
A double storey in Gadap is decided in the first slab: the stair, the toilet drops, and the weight of the upper floor. If the house is already standing, the first job is to look at that slab.
What usually goes wrong
Promising the first floor later, on concrete nobody designed for it.
Labor rate
Labor for two floors includes the stair. A hole with no stair is not a complete structure. A labor rate covers the people who open, rebuild, and plaster. You arrange cement, steel, and brick if the structure needs them. We do not price a paint job as a new house, and we do not price a new slab as paint.
With material
With material, the upper floor is in the steel of the first slab, or it is refused. It is not implied. With material, replacement of a bath, a lintel, or a slab is in one scope. You can see which lines are labor and which lines are material before work starts.
What moves the figure
Renovation in Gadap moves with what we find in the wall, whether an extra floor is even possible, and whether you are asking for labor only or material with it.
Have this ready when you call
- 01
Photographs of the house as it stands, and the year it was built if you know it.
- 02
What must keep working during the job, especially a bathroom.
- 03
Whether you want another floor. That is a look at the existing slab.
- 04
Labor rate or with material.
Labor rate or with material
Call for the Gadap rate.
Maymarian builds Karachi residential houses on 80, 120, 240, 400, 600, 800, and 1,000 square yard plots. You can take a labor rate, or a contract with material. The figure is given on the phone, for this plot.
Labor rate
We build. You arrange the material. The labor rate follows the covered area on the Gadap plot.
With material
Labor and material in one contract. Cement, steel, and the rest sit in the scope we read with you.
What you are walking into
- 01
The bathroom failed years ago and every later coat made it harder to see.
- 02
The quote assumes an empty house and a free lane.
- 03
A wet slab is about to receive a floor finish.
What changes after the visit
- 01
Work is staged so you are not funding a full refit to learn where the leak is.
- 02
Incomplete work is listed as a gap, then priced.
- 03
You are not funding a full interior to find a leak.
After keys
Weekly reports, staged payments, no disappearing act. That is why we used them again.
Tariq Farhan, Palm Court, Seaview
A small office, but the same people who sat in the first meeting walked the slab with us.
Ahmed Raza, Bungalow Eleven, Gulshan-e-Maymar
They stayed on site until the snag list was closed. Handover matched the drawings we signed.
Imran Habib, Azure House, Clifton
The office
If the papers and the ground disagree, we stop before excavation. A fast start that has to be undone is not a saving.
Tariq Mansoor Bangash, Owner
double storey house in Gadap
A double storey house in Gadap is decided in the first slab. The stair, the toilet drops, and the weight of the upper floor have to be in the concrete. Promising the first floor later, on a slab nobody designed for it, is how the argument starts.
If the house is already standing and you want a floor added, that is a look at the existing structure, not a paint job. Renovation either includes the upper floor now or it says the slab cannot take it.
Renovation in Gadap follows this ground. Gadap land is not one soil. Fill, water, and whether a road exists in the rain come before any talk of a covered area. A drawing that assumes a finished lane is how the budget breaks.
On this ground
If the Gadap plot is filled, the footing follows the soil in the hole. A detail borrowed from another block is only a guess.
If Gadap is a society, we are still the builder. Allotment is their door.
Gadap is the edge beyond Maymar. Some plots are a short run from the office. Some are not. We say which, after the visit, before we promise a weekly walk.
Gadap land is not one soil. Fill, water, and whether a road exists in the rain come before any talk of a covered area. A drawing that assumes a finished lane is how the budget breaks.
Do you build a double storey in Gadap?
Yes, when the structure is drawn for two floors. Call 0321-2000130 or 0321-2000690 for the labor rate or the rate with material. An extra floor on an old slab waits until we have seen that slab.
What if the house in Gadap was never finished?
We write a list of what is built and what was only planned, and we price that gap. An incomplete house is not described as a coat of paint.
Who carries out the renovation?
Maymarian Builders And Developers Company, owned by Tariq Mansoor Bangash, from First R1 Lane, A42, Gulshan-e-Maymar.
Do you fix damp?
We open it. If the lane is the source, tiles are not the repair.
Call for the rate
Call 0321-2000130 or 0321-2000690. WhatsApp only the first. Labor rate or with material. The figure is on the phone.


