What a double storey house means in Gadap
A double storey in Gadap is decided in the first slab: the stair, the toilet drops, and the weight of the upper floor. If the house is already standing, the first job is to look at that slab.
What usually goes wrong
Promising the first floor later, on concrete nobody designed for it.
Labor rate
Labor for two floors includes the stair. A hole with no stair is not a complete structure. On a labor rate we build the bungalow and you arrange the material. The veranda and the stair are still drawn first. A labor gang cannot invent them on site without costing you the room they occupy.
With material
With material, the upper floor is in the steel of the first slab, or it is refused. It is not implied. With material, we supply what the bungalow scope lists and we build it. Shade, the roof, and the wet areas are in that list. A glass front is not a substitute for a veranda that works in June.
What moves the figure
A bungalow rate in Gadap moves with the covered area, whether the car actually fits the lane, and whether the contract is labor only or with material.
Have this ready when you call
- 01
The plot dimensions, measured, including any cut the road has taken.
- 02
Who lives in the house, so the rooms are not a foyer with beds around it.
- 03
Whether the car must enter, and from which side.
- 04
Labor rate or with material.
Labor rate or with material
Call for the Gadap rate.
Maymarian builds Karachi residential houses on 80, 120, 240, 400, 600, 800, and 1,000 square yard plots. You can take a labor rate, or a contract with material. The figure is given on the phone, for this plot.
Labor rate
We build. You arrange the material. The labor rate follows the covered area on the Gadap plot.
With material
Labor and material in one contract. Cement, steel, and the rest sit in the scope we read with you.
What you are walking into
- 01
The bungalow is sealed toward the only breeze the lane gets.
- 02
The car symbol fits. The car does not.
- 03
The kitchen is a corridor behind the show rooms.
What changes after the visit
- 01
The veranda is drawn toward the breeze this lane has, even when that is the side.
- 02
The car is drawn against the real turning.
- 03
Afternoon rooms are placed by asking who is home at 3 p.m.
After keys
A small office, but the same people who sat in the first meeting walked the slab with us.
Ahmed Raza, Bungalow Eleven, Gulshan-e-Maymar
Weekly reports, staged payments, no disappearing act. That is why we used them again.
Tariq Farhan, Palm Court, Seaview
They stayed on site until the snag list was closed. Handover matched the drawings we signed.
Imran Habib, Azure House, Clifton
The office
A Maymar lane and a coastal house are specified differently. The office writing your set is the one that has stood on both.
Tariq Mansoor Bangash, Owner
double storey house in Gadap
A double storey house in Gadap is decided in the first slab. The stair, the toilet drops, and the weight of the upper floor have to be in the concrete. Promising the first floor later, on a slab nobody designed for it, is how the argument starts.
If the house is already standing and you want a floor added, that is a look at the existing structure, not a paint job. Bungalow either includes the upper floor now or it says the slab cannot take it.
Bungalow in Gadap follows this ground. Gadap land is not one soil. Fill, water, and whether a road exists in the rain come before any talk of a covered area. A drawing that assumes a finished lane is how the budget breaks.
On this ground
A Gadap price asked for on the phone is a guess. The visit is what turns it into a scope.
Gadap sits in the part of Karachi this office already works. We do not fly a crew in for a single slab.
Gadap is the edge beyond Maymar. Some plots are a short run from the office. Some are not. We say which, after the visit, before we promise a weekly walk.
Gadap land is not one soil. Fill, water, and whether a road exists in the rain come before any talk of a covered area. A drawing that assumes a finished lane is how the budget breaks.
Do you build a double storey in Gadap?
Yes, when the structure is drawn for two floors. Call 0321-2000130 or 0321-2000690 for the labor rate or the rate with material. An extra floor on an old slab waits until we have seen that slab.
How long does a Gadap bungalow take?
Most take twelve to twenty-four months after the scope is signed, depending on covered area and finish.
How do we start?
WhatsApp 0321-2000130 with the plot and the rooms. Or call 0321-2000690.
Do you build family bungalows in Gadap?
Yes. A single house with a veranda, planned for the plot, not copied from a villa.
Call for the rate
Bring the papers to First R1 Lane, A42. Labor rate or with material. The figure is on the phone.


