Maymarian Builders And Developers Company
Skip to content
Maymarian Builders And Developers Company
600 square yard plot, Renovation in Gulzar-e-Hijri, Karachi

Gulzar-e-Hijri · Karachi

Renovation for a 600 square yard plot in Gulzar-e-Hijri.

A leaking roof was left under the new ceiling so the room could be photographed.

What a 600 square yard plot means in Gulzar-e-Hijri

Six hundred square yards in Gulzar-e-Hijri can hold the house and a separate outdoor room. The rooms should still be grouped. A plan that wanders across the plot makes a long roof and a tired walk.

What usually goes wrong

Spreading the building to touch more boundary looks generous on a drawing and expensive in concrete.

Labor rate

The labor rate follows the grouped plan. Open ground is not a labor item. A labor rate covers the people who open, rebuild, and plaster. You arrange cement, steel, and brick if the structure needs them. We do not price a paint job as a new house, and we do not price a new slab as paint.

With material

Material follows the slabs and the walls we actually build. Unused yardage should stay out of the bill. With material, replacement of a bath, a lintel, or a slab is in one scope. You can see which lines are labor and which lines are material before work starts.

What moves the figure

Renovation in Gulzar-e-Hijri moves with what we find in the wall, whether an extra floor is even possible, and whether you are asking for labor only or material with it.

Have this ready when you call

  1. 01

    Photographs of the house as it stands, and the year it was built if you know it.

  2. 02

    What must keep working during the job, especially a bathroom.

  3. 03

    Whether you want another floor. That is a look at the existing slab.

  4. 04

    Labor rate or with material.

Labor rate or with material

Call for the Gulzar-e-Hijri rate.

Maymarian builds Karachi residential houses on 80, 120, 240, 400, 600, 800, and 1,000 square yard plots. You can take a labor rate, or a contract with material. The figure is given on the phone, for this plot.

Labor rate

We build. You arrange the material. The labor rate follows the covered area on the Gulzar-e-Hijri plot.

With material

Labor and material in one contract. Cement, steel, and the rest sit in the scope we read with you.

What you are walking into

  1. 01

    You are living upstairs while the ground floor is the job, or the other way around.

  2. 02

    Adding a floor is being sold as paint and a staircase.

  3. 03

    Every coat made the bath harder to understand.

What changes after the visit

  1. 01

    The roof is its own stage. It is not hidden inside a tile package.

  2. 02

    We open the wall before we price the finish. Damp is named, not covered.

  3. 03

    Low damp is traced to the lane before tiles.

After keys

  • A small office, but the same people who sat in the first meeting walked the slab with us.

    Ahmed Raza, Bungalow Eleven, Gulshan-e-Maymar

  • They stayed on site until the snag list was closed. Handover matched the drawings we signed.

    Imran Habib, Azure House, Clifton

  • Weekly reports, staged payments, no disappearing act. That is why we used them again.

    Tariq Farhan, Palm Court, Seaview

The office

Staged payment is the rule. A quiet site is not financed in advance.

Tariq Mansoor Bangash, Owner

600 square yard house in Gulzar-e-Hijri

A 600 square yard plot in Gulzar-e-Hijri can hold a house and a real outdoor room. It can also hold a plan that wanders. We draw the rooms first, then decide how much of the yard stays open.

Labor rate or with material are both available on a 600 square yard house. Call 0321-2000130 or 0321-2000690 and say which contract you want. Renovation in Gulzar-e-Hijri is quoted for the covered area we agree.

Many renovations here are about a leaking roof and a stair that was never wide enough. We price the roof as its own stage. A new tile floor on a wet slab is not a renovation.

On this ground

Materials for Gulzar-e-Hijri follow the road you have, including the week it is dug up.

We read the Gulzar-e-Hijri papers against the ground and we show you the line where they do not match.

It is close enough to Gulshan-e-Maymar for weekly site walks without a separate camp. Streets are mixed: some tight, some open. The method follows the street.

Houses of different ages share a block. Groundwater and roof leaks show up more often than exotic soil problems. We look at the neighbour's courtyard before we set our plinth, because water does not respect a boundary wall.

Do you build 600 square yard houses in Gulzar-e-Hijri?

Yes. Call 0321-2000130 or 0321-2000690 for the labor rate or the rate with material. We build this size across Karachi residential plots.

How fast can you start?

After the opening and the written scope. A start that has not looked is not fast.

Do you add a floor in Gulzar-e-Hijri?

Only after the existing slab has been seen. An extra floor is a structural decision, not a finish.

Do you travel to Gulzar-e-Hijri for a repair?

Yes, when the visit is justified. The office is in Gulshan-e-Maymar.

Call for the rate

Name the rooms you need before you name the elevation. Labor rate or with material. The figure is on the phone.