How renovation is scoped in Gulzar-e-Hijri
Renovation in Gulzar-e-Hijri is priced as a labor rate, or as a contract with material. The figure follows this plot. It is given on the phone, not on a printed card.
What this work includes
Renovation in Gulzar-e-Hijri starts by opening what is already there. An old slab, a tired stair, and a bathroom that has to stay usable are the job. A new elevation on an unseen structure is how the budget breaks.
Labor rate
A labor rate covers the people who open, rebuild, and plaster. You arrange cement, steel, and brick if the structure needs them. We do not price a paint job as a new house, and we do not price a new slab as paint.
With material
With material, replacement of a bath, a lintel, or a slab is in one scope. You can see which lines are labor and which lines are material before work starts.
What moves the figure
Renovation in Gulzar-e-Hijri moves with what we find in the wall, whether an extra floor is even possible, and whether you are asking for labor only or material with it.
Have this ready when you call
- 01
Photographs of the house as it stands, and the year it was built if you know it.
- 02
What must keep working during the job, especially a bathroom.
- 03
Whether you want another floor. That is a look at the existing slab.
- 04
Labor rate or with material.
Labor rate or with material
Call for the Gulzar-e-Hijri rate.
Maymarian builds Karachi residential houses on 80, 120, 240, 400, 600, 800, and 1,000 square yard plots. You can take a labor rate, or a contract with material. The figure is given on the phone, for this plot.
Labor rate
We build. You arrange the material. The labor rate follows the covered area on the Gulzar-e-Hijri plot.
With material
Labor and material in one contract. Cement, steel, and the rest sit in the scope we read with you.
What you are walking into
- 01
You are living upstairs while the ground floor is the job, or the other way around.
- 02
Adding a floor is being sold as paint and a staircase.
- 03
Every coat made the bath harder to understand.
What changes after the visit
- 01
The roof is its own stage. It is not hidden inside a tile package.
- 02
We open the wall before we price the finish. Damp is named, not covered.
- 03
Low damp is traced to the lane before tiles.
After keys
A small office, but the same people who sat in the first meeting walked the slab with us.
Ahmed Raza, Bungalow Eleven, Gulshan-e-Maymar
They stayed on site until the snag list was closed. Handover matched the drawings we signed.
Imran Habib, Azure House, Clifton
Weekly reports, staged payments, no disappearing act. That is why we used them again.
Tariq Farhan, Palm Court, Seaview
The office
Staged payment is the rule. A quiet site is not financed in advance.
Tariq Mansoor Bangash, Owner
Renovation in Gulzar-e-Hijri
Renovation payments follow open, then repair, then finish.
House repair begins where the failure is. A leaking roof is priced on its own. A new ceiling under a wet slab is not a renovation we will sign.
Many renovations here are about a leaking roof and a stair that was never wide enough. We price the roof as its own stage. A new tile floor on a wet slab is not a renovation.
On this ground
Materials for Gulzar-e-Hijri follow the road you have, including the week it is dug up.
We read the Gulzar-e-Hijri papers against the ground and we show you the line where they do not match.
It is close enough to Gulshan-e-Maymar for weekly site walks without a separate camp. Streets are mixed: some tight, some open. The method follows the street.
Houses of different ages share a block. Groundwater and roof leaks show up more often than exotic soil problems. We look at the neighbour's courtyard before we set our plinth, because water does not respect a boundary wall.
How fast can you start?
After the opening and the written scope. A start that has not looked is not fast.
Do you add a floor in Gulzar-e-Hijri?
Only after the existing slab has been seen. An extra floor is a structural decision, not a finish.
Do you travel to Gulzar-e-Hijri for a repair?
Yes, when the visit is justified. The office is in Gulshan-e-Maymar.
Call for the rate
Name the rooms you need before you name the elevation. Labor rate or with material. The figure is on the phone.


