What a double storey house means in Scheme 33
A double storey in Scheme 33 is decided in the first slab: the stair, the toilet drops, and the weight of the upper floor. If the house is already standing, the first job is to look at that slab.
What usually goes wrong
Promising the first floor later, on concrete nobody designed for it.
Labor rate
Labor for two floors includes the stair. A hole with no stair is not a complete structure. A labor rate covers the people who open, rebuild, and plaster. You arrange cement, steel, and brick if the structure needs them. We do not price a paint job as a new house, and we do not price a new slab as paint.
With material
With material, the upper floor is in the steel of the first slab, or it is refused. It is not implied. With material, replacement of a bath, a lintel, or a slab is in one scope. You can see which lines are labor and which lines are material before work starts.
What moves the figure
Renovation in Scheme 33 moves with what we find in the wall, whether an extra floor is even possible, and whether you are asking for labor only or material with it.
Have this ready when you call
- 01
Photographs of the house as it stands, and the year it was built if you know it.
- 02
What must keep working during the job, especially a bathroom.
- 03
Whether you want another floor. That is a look at the existing slab.
- 04
Labor rate or with material.
Labor rate or with material
Call for the Scheme 33 rate.
Maymarian builds Karachi residential houses on 80, 120, 240, 400, 600, 800, and 1,000 square yard plots. You can take a labor rate, or a contract with material. The figure is given on the phone, for this plot.
Labor rate
We build. You arrange the material. The labor rate follows the covered area on the Scheme 33 plot.
With material
Labor and material in one contract. Cement, steel, and the rest sit in the scope we read with you.
What you are walking into
- 01
Repair and rebuild are one number, so both are wrong.
- 02
Every coat made the bath harder to understand.
- 03
The quote assumes an empty house and a free lane.
What changes after the visit
- 01
A cracked beam is shown, not boxed.
- 02
If the frame deserves to stay, we keep it. If it does not, we say why.
- 03
One bathroom stays in use when you are living there.
After keys
Weekly reports, staged payments, no disappearing act. That is why we used them again.
Tariq Farhan, Palm Court, Seaview
They stayed on site until the snag list was closed. Handover matched the drawings we signed.
Imran Habib, Azure House, Clifton
A small office, but the same people who sat in the first meeting walked the slab with us.
Ahmed Raza, Bungalow Eleven, Gulshan-e-Maymar
The office
We have been in operation since 2014. Fewer houses, so a slab still has a name on it.
Tariq Mansoor Bangash, Owner
double storey house in Scheme 33
A double storey house in Scheme 33 is decided in the first slab. The stair, the toilet drops, and the weight of the upper floor have to be in the concrete. Promising the first floor later, on a slab nobody designed for it, is how the argument starts.
If the house is already standing and you want a floor added, that is a look at the existing structure, not a paint job. Renovation either includes the upper floor now or it says the slab cannot take it.
Renovation here is usually an occupied ground floor with a family upstairs, or a house that was left at plaster. Work is staged so one bathroom stays usable. That is a site problem, not a brochure line.
On this ground
We read the Scheme 33 papers against the ground and we show you the line where they do not match.
Deliveries for a Scheme 33 house follow the road you have, including the weeks it is dug up for someone else’s connection.
Travel from our Gulshan-e-Maymar office is short enough that the same site engineer can hold the job. Access inside Scheme 33 depends on the block. We visit before we programme concrete.
Some Scheme 33 land is filled. Footings follow that fact. We do not reuse a Maymar footing detail on a plot that sponges underfoot. The plinth is set to the road you have, including the monsoon level of that road.
Do you build a double storey in Scheme 33?
Yes, when the structure is drawn for two floors. Call 0321-2000130 or 0321-2000690 for the labor rate or the rate with material. An extra floor on an old slab waits until we have seen that slab.
Is a kitchen remodel a renovation?
Only if the brief is the kitchen. A wet roof hiding under that remodel is a different stage.
Do you travel to Scheme 33 for a repair?
Yes, when the visit is justified. The office is in Gulshan-e-Maymar.
Will you keep the old structure?
When it deserves to stay. You see the opened slab and any cracked beam before we cover them again.
Call for the rate
Talk to the office that will still answer when the slab is poured. Labor rate or with material. The figure is on the phone.


