What a 120 square yard plot means in Scheme 45
A 120 square yard house in Scheme 45 is the family size we see most. One stair, wet areas stacked above each other, and a car only when the turning on this lane is real.
What usually goes wrong
Quotes for 120 yards disagree because they hide different covered areas. Compare the drawing, not the yardage on the letter.
Labor rate
A labor rate on 120 yards still needs you to know the covered area. Two families on the same plot can build very different houses. A labor rate covers the people who open, rebuild, and plaster. You arrange cement, steel, and brick if the structure needs them. We do not price a paint job as a new house, and we do not price a new slab as paint.
With material
With material, the cement and steel follow that covered area. A 120 is not half of a 240, so the slab is not half a 240 slab. With material, replacement of a bath, a lintel, or a slab is in one scope. You can see which lines are labor and which lines are material before work starts.
What moves the figure
Renovation in Scheme 45 moves with what we find in the wall, whether an extra floor is even possible, and whether you are asking for labor only or material with it.
Have this ready when you call
- 01
Photographs of the house as it stands, and the year it was built if you know it.
- 02
What must keep working during the job, especially a bathroom.
- 03
Whether you want another floor. That is a look at the existing slab.
- 04
Labor rate or with material.
Labor rate or with material
Call for the Scheme 45 rate.
Maymarian builds Karachi residential houses on 80, 120, 240, 400, 600, 800, and 1,000 square yard plots. You can take a labor rate, or a contract with material. The figure is given on the phone, for this plot.
Labor rate
We build. You arrange the material. The labor rate follows the covered area on the Scheme 45 plot.
With material
Labor and material in one contract. Cement, steel, and the rest sit in the scope we read with you.
What you are walking into
- 01
The empty-house price arrived for a full house.
- 02
Every coat made the bath harder to understand.
- 03
You cannot tell what is built and what was only hoped for.
What changes after the visit
- 01
We open before we price the finish.
- 02
If the frame deserves to stay, we keep it. If it does not, we say why.
- 03
One bathroom stays usable when the family is in the house.
After keys
Weekly reports, staged payments, no disappearing act. That is why we used them again.
Tariq Farhan, Palm Court, Seaview
A small office, but the same people who sat in the first meeting walked the slab with us.
Ahmed Raza, Bungalow Eleven, Gulshan-e-Maymar
They stayed on site until the snag list was closed. Handover matched the drawings we signed.
Imran Habib, Azure House, Clifton
The office
Maymarian Builders And Developers Company is owned by Tariq Mansoor Bangash. The office is First R1 Lane, A42, Gulshan-e-Maymar, Karachi.
Tariq Mansoor Bangash, Owner
120 square yard house in Scheme 45
A 120 square yard house is the size that shows up most often in Scheme 45 searches and in the folder of quotes a family brings to the office. Those quotes rarely share a covered area, which is why they do not agree.
120 square yards is not a smaller 240. The section, the stair, and the wet areas change. Renovation on this plot starts with measuring the lane, including the cut the road has already taken.
Renovation in Scheme 45 follows this ground. Scheme 45 plots are often compared with Scheme 33 and with Maymar. The comparison fails when the fill is different. Footings follow the hole we dig, not the neighbouring scheme’s detail.
On this ground
From First R1 Lane, a Scheme 45 plot is a visit, not a pin on a brochure.
Search interest in Scheme 45 is usually a plot the family already owns. That is the job we take.
Scheme 45 sits on the same side of the city as our office. We still visit before we programme a pour, because the internal road may not match the plan.
Scheme 45 plots are often compared with Scheme 33 and with Maymar. The comparison fails when the fill is different. Footings follow the hole we dig, not the neighbouring scheme’s detail.
Do you take a 120 square yard house in Scheme 45?
Yes. Call 0321-2000130 or 0321-2000690. Say whether you want the labor rate or the contract with material, and we will give the rate for this 120 yard plot.
Will you add a floor in Scheme 45?
Only after the slab is seen.
What if the house in Scheme 45 was never finished?
We write a list of what is built and what was only planned, and we price that gap. An incomplete house is not described as a coat of paint.
Can you work while we live in the Scheme 45 house?
Often, yes. The programme leaves one bathroom usable and stages the dust. If the job cannot be lived in, we say so before we start.
Call for the rate
Ask for a written scope after the visit. That page is what the contract is built from. Labor rate or with material. The figure is on the phone.


