Maymarian Builders And Developers Company
Skip to content
Maymarian Builders And Developers Company
200 square yard plot, Grey structure in Gulshan-e-Maymar, Karachi

Gulshan-e-Maymar · Karachi

Grey structure for a 200 square yard plot in Gulshan-e-Maymar.

You need the structure to take a mumty later without a new column through the lounge.

What a 200 square yard plot means in Gulshan-e-Maymar

Two hundred yards in Gulshan-e-Maymar can take the rooms a family names, plus one decision: the extra room, or the light. Both at once is how the plan gets worse.

What usually goes wrong

People invent a fourth room to use the yardage. The house then has no wall that can hold a bed and a window.

Labor rate

Labor follows the rooms you keep, not the rooms a relative added in the margin. A labor rate on grey structure is the mason, the carpenter, the steel fixer, and the helpers. You supply cement, steel, brick, sand, and crush. The stair opening and the toilet drops still have to be in the drawing, or the labor builds a frame the finish cannot use.

With material

Material follows the same rooms. An extra bathroom that was never drawn becomes an extra slab and an extra stack of steel. With material, those same items are in our contract. Steel weight and slab thickness are why two grey-structure quotes on the same Gulshan-e-Maymar plot do not match. We name them before anyone orders.

What moves the figure

The grey-structure figure in Gulshan-e-Maymar moves with the hole we dig, the span of the lanter, whether another floor sits on it, and how much brickwork is inside the stop line.

Have this ready when you call

  1. 01

    Plot papers and the yardage on the ground, not only in the chat.

  2. 02

    Whether a floor will be added later. That decision is made in this slab.

  3. 03

    Where the bathrooms are. The drops cannot be invented after the concrete.

  4. 04

    Labor rate, or with material.

Labor rate or with material

Call for the Gulshan-e-Maymar rate.

Maymarian builds Karachi residential houses on 80, 120, 240, 400, 600, 800, and 1,000 square yard plots. You can take a labor rate, or a contract with material. The figure is given on the phone, for this plot.

Labor rate

We build. You arrange the material. The labor rate follows the covered area on the Gulshan-e-Maymar plot.

With material

Labor and material in one contract. Cement, steel, and the rest sit in the scope we read with you.

What you are walking into

  1. 01

    Curing was a verbal promise. The concrete has already gone pale.

  2. 02

    The stair opening is a hole. The stair itself was left for someone else to invent.

  3. 03

    You were told grey structure is simple, then handed a cantilever the plot does not need.

What changes after the visit

  1. 01

    You pay the stage you can see: hole, steel, slab, brick.

  2. 02

    Brickwork stops at a line you can point at. The finish contract starts there.

  3. 03

    Excavation is sequenced so the lane is not occupied for a month.

After keys

  • A small office, but the same people who sat in the first meeting walked the slab with us.

    Ahmed Raza, Bungalow Eleven, Gulshan-e-Maymar

  • They stayed on site until the snag list was closed. Handover matched the drawings we signed.

    Imran Habib, Azure House, Clifton

  • Weekly reports, staged payments, no disappearing act. That is why we used them again.

    Tariq Farhan, Palm Court, Seaview

The office

Copyright in our drawings stays with the company until a commission says otherwise.

Tariq Mansoor Bangash, Owner

200 square yard house in Gulshan-e-Maymar

A 200 square yard plot in Gulshan-e-Maymar is the awkward middle. It invites one extra room that ruins the others. We would rather draw the rooms the family named than invent a fourth to use up the yardage.

A 200 square yard house in Gulshan-e-Maymar is priced two ways: labor rate, or with material. Fill and covered area move both. Call 0321-2000130 or 0321-2000690 for the rate on this plot.

Grey structure in Gulshan-e-Maymar is often split from finishing so a family can pause. The pause only works if the slab levels, the toilet drops, and the future stair are already in the concrete. We do not leave those decisions for a second contractor to discover.

On this ground

The useful map of Gulshan-e-Maymar is the lane, the fill, and the sewer, not a sector ranking.

Tariq Mansoor Bangash owns Maymarian. Gulshan-e-Maymar work is run from First R1 Lane, A42, not from a site hut with no name on the gate.

The office sits inside Gulshan-e-Maymar, off the Super Highway side of north Karachi. Clients usually arrive with a plot number and a lane, not with a mood board. We can walk most Maymar plots without turning the visit into a trip.

Maymar is a planned residential scheme launched in the 1980s. Roads, plot lines, and neighbours already exist. The useful questions are the width of your lane, whether the plot is filled, where the sewer sits, and how much covered area the family actually needs. People ask which sector is best. A sector is not a ranking. Two plots on the same road can differ by a metre of fill.

Gulshan-e-Maymar the housing scheme was planned by Maymar Housing Services. Maymarian builds houses. Those are different names, and this office does not sell society plots.

Is a 200 square yard house the same plan as a 240?

No. Two hundred yards in Gulshan-e-Maymar gets its own section. Scaling a larger plan is how a room becomes a passage.

Can grey structure in Gulshan-e-Maymar be paused?

Yes. The pause is real only if drops, levels, and the stair are already decided.

Can you start grey structure before the papers are clear?

No. Excavation waits until the authority for that plot is understood. A start that stops is not progress.

What does grey structure in Gulshan-e-Maymar cost?

Covered area, soil, and whether the roof must take a later room all change the figure. We price it after a visit. There is no per-yard card.

Call for the rate

Write to the office about the land and the family. The facade can wait. Labor rate or with material. The figure is on the phone.