What a double storey house means in Saadi Town
A double storey in Saadi Town is decided in the first slab: the stair, the toilet drops, and the weight of the upper floor. If the house is already standing, the first job is to look at that slab.
What usually goes wrong
Promising the first floor later, on concrete nobody designed for it.
Labor rate
Labor for two floors includes the stair. A hole with no stair is not a complete structure. A labor rate means Maymarian builds and you arrange the material: cement, steel, brick, sand, and crush. You still need a drawing, because labor on the wrong plan is wasted money.
With material
With material, the upper floor is in the steel of the first slab, or it is refused. It is not implied. With material means labor and material are one contract. We buy what the scope names, and you are not running to the market between the footing and the slab.
What moves the figure
In Saadi Town the figure moves with covered area, one floor or two, whether the contract stops at grey structure, how much fill is in the hole, and whether you chose labor only or material with it.
Have this ready when you call
- 01
The plot papers, and the yardage written on them.
- 02
The lane, so we know how concrete and steel arrive in Saadi Town.
- 03
How many people sleep there, and whether the house is one floor or two.
- 04
Whether you want a labor rate or a contract with material.
Labor rate or with material
Call for the Saadi Town rate.
Maymarian builds Karachi residential houses on 80, 120, 240, 400, 600, 800, and 1,000 square yard plots. You can take a labor rate, or a contract with material. The figure is given on the phone, for this plot.
Labor rate
We build. You arrange the material. The labor rate follows the covered area on the Saadi Town plot.
With material
Labor and material in one contract. Cement, steel, and the rest sit in the scope we read with you.
What you are walking into
- 01
The approval is assumed. The excavation date is already in the message.
- 02
You have been collecting rates, and each one assumes a different house.
- 03
A house construction figure with no covered area is a sentence, not a budget.
What changes after the visit
- 01
Weekly notes show what changed on site, including the parts that were wrong.
- 02
The same office draws the set and walks the slab.
- 03
Weekly notes include the mistake, not only the progress.
After keys
A small office, but the same people who sat in the first meeting walked the slab with us.
Ahmed Raza, Bungalow Eleven, Gulshan-e-Maymar
They stayed on site until the snag list was closed. Handover matched the drawings we signed.
Imran Habib, Azure House, Clifton
Weekly reports, staged payments, no disappearing act. That is why we used them again.
Tariq Farhan, Palm Court, Seaview
The office
Maymarian™ is the trademark of Maymarian Builders And Developers Company. The scheme next door is a different name.
Tariq Mansoor Bangash, Owner
double storey house in Saadi Town
A double storey house in Saadi Town is decided in the first slab. The stair, the toilet drops, and the weight of the upper floor have to be in the concrete. Promising the first floor later, on a slab nobody designed for it, is how the argument starts.
If the house is already standing and you want a floor added, that is a look at the existing structure, not a paint job. House construction either includes the upper floor now or it says the slab cannot take it.
Saadi Town clients usually want a family bungalow, not a statement. The plans that work are the ones with a proper servant yard, a car that actually fits, and bedrooms that do not open onto the drawing room.
On this ground
If Saadi Town is a society, we are still the builder. Allotment is their door.
If the Saadi Town plot is filled, the footing follows the soil in the hole. A detail borrowed from another block is only a guess.
Saadi Town sits on the Super Highway side of north Karachi, in the same travel pattern as Maymar. Site visits are part of the week, not a special expedition.
The schemes are residential and comparatively regular. The failures we see are houses that were built fast: a slab asked to carry another floor, or a stair that was poured as an afterthought. We check those before we decorate them.
Do you build a double storey in Saadi Town?
Yes, when the structure is drawn for two floors. Call 0321-2000130 or 0321-2000690 for the labor rate or the rate with material. An extra floor on an old slab waits until we have seen that slab.
How do payments work on a Saadi Town house?
Against a completed stage. You are not asked to fund a silent month.
Do you take a corner plot in Saadi Town?
Yes. One side stays private. Two streets are not a reason to glaze every room.
Can house construction in Saadi Town stop at the structure?
Yes, if that is the scope. The stair and the drops are decided before we stop.
Call for the rate
Talk to the office that will still answer when the slab is poured. Labor rate or with material. The figure is on the phone.