What a double storey house means in New Karachi
A double storey in New Karachi is decided in the first slab: the stair, the toilet drops, and the weight of the upper floor. If the house is already standing, the first job is to look at that slab.
What usually goes wrong
Promising the first floor later, on concrete nobody designed for it.
Labor rate
Labor for two floors includes the stair. A hole with no stair is not a complete structure. A labor rate means Maymarian builds and you arrange the material: cement, steel, brick, sand, and crush. You still need a drawing, because labor on the wrong plan is wasted money.
With material
With material, the upper floor is in the steel of the first slab, or it is refused. It is not implied. With material means labor and material are one contract. We buy what the scope names, and you are not running to the market between the footing and the slab.
What moves the figure
In New Karachi the figure moves with covered area, one floor or two, whether the contract stops at grey structure, how much fill is in the hole, and whether you chose labor only or material with it.
Have this ready when you call
- 01
The plot papers, and the yardage written on them.
- 02
The lane, so we know how concrete and steel arrive in New Karachi.
- 03
How many people sleep there, and whether the house is one floor or two.
- 04
Whether you want a labor rate or a contract with material.
Labor rate or with material
Call for the New Karachi rate.
Maymarian builds Karachi residential houses on 80, 120, 240, 400, 600, 800, and 1,000 square yard plots. You can take a labor rate, or a contract with material. The figure is given on the phone, for this plot.
Labor rate
We build. You arrange the material. The labor rate follows the covered area on the New Karachi plot.
With material
Labor and material in one contract. Cement, steel, and the rest sit in the scope we read with you.
What you are walking into
- 01
The estimate treats fill as a line item you can delete if you feel brave.
- 02
A per-foot number arrived with no drawing attached.
- 03
Someone priced a 240 yard house as if it were a larger 120, with the same stair and the same roof.
What changes after the visit
- 01
The car is checked against the turning the street allows.
- 02
Weekly notes show what changed on site, including the parts that were wrong.
- 03
Staged payments follow work you can stand on, not a calendar.
After keys
A small office, but the same people who sat in the first meeting walked the slab with us.
Ahmed Raza, Bungalow Eleven, Gulshan-e-Maymar
Weekly reports, staged payments, no disappearing act. That is why we used them again.
Tariq Farhan, Palm Court, Seaview
They stayed on site until the snag list was closed. Handover matched the drawings we signed.
Imran Habib, Azure House, Clifton
The office
The weekly note shows the problem before it shows the progress. That is the practice, not a slogan under the logo.
Tariq Mansoor Bangash, Owner
double storey house in New Karachi
A double storey house in New Karachi is decided in the first slab. The stair, the toilet drops, and the weight of the upper floor have to be in the concrete. Promising the first floor later, on a slab nobody designed for it, is how the argument starts.
If the house is already standing and you want a floor added, that is a look at the existing structure, not a paint job. House construction either includes the upper floor now or it says the slab cannot take it.
House construction in New Karachi follows this ground. New Karachi work is often a house from an earlier decade, or a plot where an old house came down. Renovation and a new frame both start by opening what is already in the ground.
On this ground
Search interest in New Karachi is usually a plot the family already owns. That is the job we take.
Deliveries for a New Karachi house follow the road you have, including the weeks it is dug up for someone else’s connection.
New Karachi is an established drive from Maymar. The constraint is the street you turn into, which may already be full of gates.
New Karachi work is often a house from an earlier decade, or a plot where an old house came down. Renovation and a new frame both start by opening what is already in the ground.
Do you build a double storey in New Karachi?
Yes, when the structure is drawn for two floors. Call 0321-2000130 or 0321-2000690 for the labor rate or the rate with material. An extra floor on an old slab waits until we have seen that slab.
How do payments work on a New Karachi house?
Against a completed stage. You are not asked to fund a silent month.
How long does house construction in New Karachi take?
Most houses take twelve to twenty-four months after the scope is signed, depending on covered area, approvals, and how much of the finish is in this contract.
Do you build only large houses in New Karachi?
No. Eighty yards, a three-room house, and a 240 are different jobs. All of them need a real plan.
Call for the rate