What a double storey house means in Gulshan-e-Iqbal
A double storey in Gulshan-e-Iqbal is decided in the first slab: the stair, the toilet drops, and the weight of the upper floor. If the house is already standing, the first job is to look at that slab.
What usually goes wrong
Promising the first floor later, on concrete nobody designed for it.
Labor rate
Labor for two floors includes the stair. A hole with no stair is not a complete structure. A labor rate covers the people who open, rebuild, and plaster. You arrange cement, steel, and brick if the structure needs them. We do not price a paint job as a new house, and we do not price a new slab as paint.
With material
With material, the upper floor is in the steel of the first slab, or it is refused. It is not implied. With material, replacement of a bath, a lintel, or a slab is in one scope. You can see which lines are labor and which lines are material before work starts.
What moves the figure
Renovation in Gulshan-e-Iqbal moves with what we find in the wall, whether an extra floor is even possible, and whether you are asking for labor only or material with it.
Have this ready when you call
- 01
Photographs of the house as it stands, and the year it was built if you know it.
- 02
What must keep working during the job, especially a bathroom.
- 03
Whether you want another floor. That is a look at the existing slab.
- 04
Labor rate or with material.
Labor rate or with material
Call for the Gulshan-e-Iqbal rate.
Maymarian builds Karachi residential houses on 80, 120, 240, 400, 600, 800, and 1,000 square yard plots. You can take a labor rate, or a contract with material. The figure is given on the phone, for this plot.
Labor rate
We build. You arrange the material. The labor rate follows the covered area on the Gulshan-e-Iqbal plot.
With material
Labor and material in one contract. Cement, steel, and the rest sit in the scope we read with you.
What you are walking into
- 01
The added kitchen never had a real drain.
- 02
The kitchen was added later and the drain was an opinion.
- 03
A sound frame is being priced as a demolition.
What changes after the visit
- 01
An extra floor waits on the slab we can see.
- 02
You are not funding a full interior to find a leak.
- 03
The scope says repair, or it says new. Not both in one fog.
After keys
They stayed on site until the snag list was closed. Handover matched the drawings we signed.
Imran Habib, Azure House, Clifton
Weekly reports, staged payments, no disappearing act. That is why we used them again.
Tariq Farhan, Palm Court, Seaview
A small office, but the same people who sat in the first meeting walked the slab with us.
Ahmed Raza, Bungalow Eleven, Gulshan-e-Maymar
The office
Call 0321-2000130 or 0321-2000690. WhatsApp is on 0321-2000130. Someone at the Gulshan-e-Maymar office answers during working hours.
Tariq Mansoor Bangash, Owner
double storey house in Gulshan-e-Iqbal
A double storey house in Gulshan-e-Iqbal is decided in the first slab. The stair, the toilet drops, and the weight of the upper floor have to be in the concrete. Promising the first floor later, on a slab nobody designed for it, is how the argument starts.
If the house is already standing and you want a floor added, that is a look at the existing structure, not a paint job. Renovation either includes the upper floor now or it says the slab cannot take it.
Renovation in Gulshan-e-Iqbal follows this ground. Gulshan-e-Iqbal is already built up. A new house is an insertion between neighbours. Working hours, the gate opposite, and an old footing in the ground matter more than a new elevation.
On this ground
The useful map of Gulshan-e-Iqbal is the lane, the fill, and the sewer, not a sector ranking.
A house in Gulshan-e-Iqbal already has neighbours and a road level. The monsoon uses that road, whether the drawing mentions it or not.
From Gulshan-e-Maymar the drive is a known one. Inside Gulshan-e-Iqbal the lane, not the block name, decides how concrete arrives.
Gulshan-e-Iqbal is already built up. A new house is an insertion between neighbours. Working hours, the gate opposite, and an old footing in the ground matter more than a new elevation.
Do you build a double storey in Gulshan-e-Iqbal?
Yes, when the structure is drawn for two floors. Call 0321-2000130 or 0321-2000690 for the labor rate or the rate with material. An extra floor on an old slab waits until we have seen that slab.
Can you work while we live in the Gulshan-e-Iqbal house?
Often, yes. The programme leaves one bathroom usable and stages the dust. If the job cannot be lived in, we say so before we start.
Do you add a floor in Gulshan-e-Iqbal?
Only after the existing slab has been seen. An extra floor is a structural decision, not a finish.
What if the house was never finished?
We list what exists and price the gap.
Call for the rate
Ask for the written scope. That page becomes the contract. Labor rate or with material. The figure is on the phone.